This is a list of electricity-generating power stations in the U.S. state of Iowa, sorted by type and name. In 2019, Iowa had a total summer capacity of 20,410 MW through all of its power plants, and a net generation of 61,674 GWh.[2] The corresponding electrical energy generation mix was 41.1% wind, 35.9% coal, 12.5% natural gas, 8.5% nuclear, 1.3% hydroelectric 0.4% petroleum, and 0.3% biomass. Small-scale solar, which includes customer-owned photovoltaic panels, delivered an additional net 160 GWh to the state's electrical grid. This was ten times more than the 0.025% share of generation by Iowa's utility-scale photovoltaic plants.[1]
Sources of Iowa utility-scale electricity generation:
full-year 2021 [1]
Iowa has been among the top-five energy-consuming states, due in large part to its productive agriculture industry. State regulators implemented the nation's first renewable portfolio standard (RPS) applied to investor-owned utilities in 1983. The modest goal of 105 MW was soon met, and was exceeded nearly 100 times over by the end of 2019. All electrical utility customers have had the option to support further expansion of renewable generation since 2004, and regulators have also taken steps to encourage greater efficiency of energy use. Iowa has produced more electricity than it has consumed since 2008.[3]
During 2019, wind power from about 5,100 turbines (10,200 MW) throughout Iowa generated 41% of electricity, which was the highest share among the United States.[4] Wind is a durable resource year-round and throughout the state, and trends mildest during summer months and in southeastern regions. The historic 142 MW Keokuk hydroelectric station on the Mississippi River is Iowa's longest serving facility since 1913.[3]
Map all coordinates using: OpenStreetMap |
Download coordinates as: KML |
Name | Location | Coordinates | Capacity (MW) | Refs | Year Opened | Note |
---|---|---|---|---|---|---|
Duane Arnold Energy Center (DAEC) | Linn County | 42.1011°N 91.7781°W / 42.1011; -91.7781 (Duane Arnold Nuclear) | 680 | [5] | 1975 | retired in 2020, solar farm proposed for site[6] |
Data from the U.S. Energy Information Administration serves as a general reference.[7]
A useful map[8] of active and retiring coal generation plants is provided by the Sierra Club.
Name | Location | Coordinates | Summer Capacity (MW) | Refs | Year Opened | Note |
---|---|---|---|---|---|---|
ADM Cedar Rapids Power Plant | Linn County | 41.9221°N 91.6875°W / 41.9221; -91.6875 (ADM Cedar Rapids) | 295 | [9] | 1988 | capacity increased until 2000. includes a 35MW natural gas turbine added 2016. |
ADM Clinton Power Plant | Clinton County | 41.8206°N 90.2097°W / 41.8206; -90.2097 (ADM Clinton) | 180 | [10] | 2009 | |
George Neal Energy Center | Woodbury County | 42.2998°N 96.3617°W / 42.2998; -96.3617 (George Neal Station) | 1140 | [11] | 1975 (Unit 3) 1979 (Unit 4) | Units 1&2 retired in 2016 |
Lansing Generating Station | Allamakee County | 43.3359°N 91.1675°W / 43.3359; -91.1675 (Lansing Station) | 250 | [12][13] | 1977 | retirement by 2022 |
Louisa Generating Station | Louisa County | 41.3181°N 91.0931°W / 41.3181; -91.0931 (Louisa Station) | 750 | [14] | 1983 | |
Muscatine Generating Station | Muscatine County | 41.3917°N 91.0569°W / 41.3917; -91.0569 (Muscatine Station) | 225 | [15] | 1958 | capacity increased until 2000 |
Ottumwa Generating Station | Wapello County | 41.0961°N 92.5558°W / 41.0961; -92.5558 (Ottumwa Station) | 725 | [16] | 1981 | |
Walter Scott Jr. Energy Center | Pottawattamie County | 41.1800°N 95.8408°W / 41.1800; -95.8408 (Walter Scott Station) | 1650 | [17] | 1978 (Unit 3) 2007 (Unit 4) | Units 1&2 retired in 2015 |
Many generating stations fueled by gas in Iowa are peaker plants that use simple cycle combustion turbines (SCCT). Combined cycle combustion turbines (CCCT) and steam turbines (ST) alone may also be used for base load or peaking generation.
Name | Location | Coordinates | Summer Capacity (MW) | Refs | Type | Year Opened | Note |
---|---|---|---|---|---|---|---|
Ames Steam Turbine | Story County | 42.0258°N 93.6089°W / 42.0258; -93.6089 (Ames Gas Turbine) | 95 | [18][19] | ST | 1968 | 63MW added 1982 |
Burlington Generating Station | Des Moines County | 40.7412°N 91.1167°W / 40.7412; -91.1167 (Burlington) | 245 | [20] | 1968 | Coal retirement in 2021. Includes 47MW natural gas. Turbines added 1996–1998. | |
Coralville Gas Turbine | Johnson County | 41.6719°N 91.5640°W / 41.6719; -91.5640 (Coralville Gas Turbine) | 66 | [21][22] | SCCT | 1970 | |
Earl F. Wisdom Station | Clay County | 43.1606°N 95.2569°W / 43.1606; -95.2569 (Wisdom Station) | 113 | [23][24][25] | ST SCCT | 1960 (ST) 2004 (SCCT) | 38MW ST 76MW SCCT |
Electrifarm Power Plant | Black Hawk County | 42.4407°N 92.4205°W / 42.4407; -92.4205 (Electrifarm Power Plant) | 183 | [26][27] | SCCT | 1975 (Unit 1) 1978 (Units 2&3) | |
Emery Generating Station | Cerro Gordo County | 43.0940°N 93.2922°W / 43.0940; -93.2922 (Emery Station) | 535 | [28][29] | CCCT | 2004 | |
Exira Station | Audubon County | 41.5144°N 94.9197°W / 41.5144; -94.9197 (Exira Station) | 140 | [30][31] | SCCT | 2004 (Units 1&2) 2007 (Unit 3) | |
Greater Des Moines Energy Center | Polk County | 41.5563°N 93.5283°W / 41.5563; -93.5283 (Greater Des Moines EC) | 485 | [32][33] | CCCT | 2004 | |
Marshalltown Generating Station | Marshall County | 42.0433°N 92.8728°W / 42.0433; -92.8728 (Marshalltown Station) | 820 | [34][35][36] | SCCT CCCT | 1978 (SCCT) 2007 (CCCT) | 170MW SCCT 650MW CCCT |
Pleasant Hill Gas Turbine | Polk County | 41.5572°N 93.5242°W / 41.5572; -93.5242 (Pleasant Hill Gas Turbine) | 156 | [37][38] | SCCT | 1990 (Units 1&2) 1994 (Unit 3) | |
Prairie Creek Generating Station | Linn County | 41.9440°N 91.6391°W / 41.9440; -91.6391 (Prairie Creek Station) | 142 | [39][40][41] | ST | 1967 | includes 29MW coal-fired capacity opened 1958 |
River Hills Gas Turbine | Polk County | 41.5902°N 93.6195°W / 41.5902; -93.6195 (River Hills Gas Turbine) | 118 | [42][43] | SCCT | 1966-1968 | |
Riverside Gas Turbine | Scott County | 41.5400°N 90.4481°W / 41.5400; -90.4481 (Riverside Gas Turbine) | 114 | [44] | ST | 1961 | |
Sycamore Gas Turbine | Polk County | 41.6722°N 93.6769°W / 41.6722; -93.6769 (Sycamore Gas Turbine) | 144 | [45][46] | SCCT | 1974 |
Data from the U.S. Energy Information Administration serves as a general reference.[7]
Name | Location | Coordinates | Capacity (MW) | Refs | Fuel | Year Opened | Note |
---|---|---|---|---|---|---|---|
AgriReNew | Scott County | 41.6919°N 90.8664°W / 41.6919; -90.8664 (AgriReNew) | 1.0 | [47][48] | biomass methane | 2013 | gas turbine |
Davenport Water Pollution Control | Scott County | 41.4928°N 90.6275°W / 41.4928; -90.6275 (Davenport WP Control) | 1.6 | [49][50] | wastewater methane | 1995 | |
Des Moines Wastewater Reclamation | Polk County | 41.5734°N 93.5577°W / 41.5734; -93.5577 (Des Moines WW Reclamation) | 2.8 | [51][52] | wastewater methane | 1991 | facility upgrades 2015, 2020[53] |
Lake Mills Gas Recovery | Winnebago County | 43.3864°N 93.5589°W / 43.3864; -93.5589 (Lake Mills Gas Recovery) | 4.0 | [54][55] | landfill gas | 2006 | |
Metro Methane Recovery | Polk County | 41.5989°N 93.3550°W / 41.5989; -93.3550 (Metro Methane Recovery) | 11.2 | [56][57] | landfill gas | 1998 | 4.8MW added 2014 |
Name | Location | Coordinates | Capacity (MW) | Refs | Year Opened | Note |
---|---|---|---|---|---|---|
5 in 1 Dam Hydro Plant | Linn County | 42.0750°N 91.6023°W / 42.0750; -91.6023 (5 in 1 Hydro) | 2.1 | [58] | 1986 | damaged in 2008 flood[59] |
Keokuk Energy Center | Lee County | 40.3965°N 91.3719°W / 40.3965; -91.3719 (Keokuk Hydro) | 142 | [60] | 1913 | |
Maquoketa Hydro Plant | Jackson County | 42.0700°N 90.6977°W / 42.0700; -90.6977 (Maquoketa Hydro) | 1.2 | [61] | 1924 | |
Ottumwa Hydro Plant | Wapello County | 41.0163°N 92.4149°W / 41.0163; -92.4149 (Ottumwa Hydro) | 3.2 | [62] | 1931 |
![]() | This list is incomplete; you can help by adding missing items. (November 2020) |
Name | Location | Coordinates | Capacity (MW) | Refs | Year Opened | Note |
---|---|---|---|---|---|---|
Adair Wind Farm | Adair County | 41°28′N 94°38′W | 175 | [63] | 2008 | |
Adams Wind Farm | Adams County | 40°55′N 94°40′W | 154 | [63] | 2015 | |
Arbor Hill Wind Farm | Adair County | 41°21′N 94°29′W | 250 | [63] | 2018 | |
Barton Wind Farm | Worth County | 43°23′N 93°05′W | 160 | [64] | 2009 | |
Beaver Creek Wind Farm I & II | Boone County Greene County | 42°02′N 94°02′W | 340 | [63][65] | 2017/2018 | |
Carol Wind Farm | Carol County | 42°10′N 94°56′W | 159 | [63] | 2008 | |
Century Wind Farm | Wright County Hamilton County | 42°30′N 93°38′W | 201 | [63] | 2005/2007 | |
Crystal Lake Wind Farm I,II,III | Winnebago County Hancock County | 43°14′N 93°50′W | 416 | [66] | 2008/2009 | |
Diamond Trail Wind Farm | Iowa County | 41°41′N 92°04′W | 252 | [63] | 2020 | |
Eclipse Wind Project | Audubon County Guthrie County | 41°41′N 94°45′W | 200 | [63][67] | 2012 | |
Endeavor Wind Farm I & II (Osceola Wind) | Osceola County | 43°26′N 95°25′W | 148 | [66] | 2008 | |
English Farms Wind | Poweshiek County | 41°34′N 92°24′W | 172 | [68] | 2019 | |
Garden Wind Farm | Hardin County | 42°13′N 93°22′W | 150 | 2009 | ||
Glaciers Edge Wind | Cherokee County | 42°52′N 95°46′W | 200 | [69] | 2019 | |
Golden Plains Wind Farm | Kossuth County Winnebago County | 43°26′N 94°01′W | 200 | [70][71] | 2020 | |
Highland Wind Energy Center | O'Brien County | 43°05′N 95°34′W | 502 | [63][72][73] | 2015 | |
Ida Grove Wind Farm I & II | Ida County | 42°16′N 95°28′W | 503 | [63][74] | 2016/2019 | |
Intrepid Wind Farm | Buena Vista County | 42°33′N 95°20′W | 175 | [63] | 2004/2005 | |
Kossuth Wind Farm | Kossuth County | 150 | [68] | 2020 | ||
Lundgren Wind Farm | Webster County | 42°17′N 93°52′W | 251 | [63] | 2014 | |
North English Wind Farm I & II | Poweshiek County | 41°41′N 92°32′W | 340 | [63] | 2018/2019 | |
O'Brien Wind Farm | O'Brien County | 43°12′N 95°38′W | 250 | [63][74] | 2016 | |
Orient Wind Farm | Adair County | 41°12′N 94°25′W | 501 | [63] | 2018/2019 | |
Palo Alto Wind Farm I & II | Palo Alto County | 43°05′N 94°41′W | 340 | [63] | 2019/2020 | |
Pioneer Prairie Wind Farm | Mitchell County Howard County | 43°28′N 92°35′W | 293 | [75] | 2008 | |
Pomeroy Wind Farm | Pocahontas County Calhoun County | 42°35′N 94°43′W | 296 | [63][76] | 2007/2008 | |
Prairie Wind | Mahaska County | 41°26′N 92°42′W | 168 | [63] | 2018 | |
Rolling Hills Wind Farm | Adair County Adams County Cass County | 41°18′N 94°47′W | 444 | [63][77] | 2011 | |
Southern Hills Wind Farm | Adair County Adams County Union County | 41°04′N 94°23′W | 254 | [63] | 2020 | |
Storm Lake Wind Farm (Buena Vista Wind) | Buena Vista County | 42°46′N 95°24′W | 185 | [78] | 1999 | |
Story County Wind Farm I & II | Story County | 42°04′N 93°19′W | 300 | [79] | 2008/2009 | |
Top of Iowa Wind Farm I,II,III | Worth County | 43°05′N 93°25′W | 190 | [80] | 2007/2008 | |
Turtle Creek Wind Farm | Mitchell County | 43°22′N 92°47′W | 200 | [81] | 2018 | |
Upland Prairie Wind Farm | Clay County | 43°12′N 95°21′W | 299 | [68] | 2019 | |
Vienna Wind Farm | Marshall County | 42°10′N 92°47′W | 150 | [63] | 2012/2013 | |
Walnut Wind Farm | Pottawattamie County | 41°27′N 95°14′W | 165 | [63] | 2008 | |
Wellsburg Wind Project | Grundy County | 42°23′N 92°58′W | 141 | [63] | 2014 | |
Whispering Willow Wind Farm East & North | Franklin County | 42°37′N 93°18′W 42°46′N 93°25′W | 400 | [82][83] | 2009/2020 |
![]() | This list is incomplete; you can help by adding missing items. (November 2020) |
{{cite web}}
: CS1 maint: multiple names: authors list (link)
State of Iowa | |
---|---|
Des Moines (capital) | |
Topics |
|
Regions |
|
Largest cities |
|
Counties |
|
![]() |
| |
---|---|
States |
|
Federal district | Washington, D.C. |
Insular areas |
|