energy.wikisort.org - Power_plantPakistan has a total installed power generation capacity of 43,775 MW as on 30 June 2022. Which includes 26,683 MW thermal, 10,635 MW hydroelectric, 1,838 MW wind, 530 MW solar, 369 MW bagasse and 3,620 MW nuclear.[1]
Location of notable power stations in Pakistan
Nuclear,
Wind/Solar,
Coal/Oil/Gas,
Hydroelectric
Thermal
In service
Currently in operation power plants.[1]
S/N |
Station | Location | Capacity (MW) |
Primary Fuel |
1 |
TPS Jamshoro | Jamshoro, Sindh | 880 |
RFO+Gas |
2 |
TPS Guddu (Units 5-10) |
Guddu, Sindh |
600 |
Gas |
3 |
TPS Guddu (Units 11-13) |
Guddu, Sindh |
415 |
Gas |
4 |
TPS Guddu (Units 14-16) |
Guddu, Sindh |
747 |
Gas |
5 |
TPS Quetta |
Quetta, Balochistan |
28 |
Gas |
6 |
TPS Muzaffargarh |
Muzaffargarh, Punjab |
1,350 |
Gas |
7 |
GTPS Faisalabad |
Faisalabad, Punjab |
144 |
Gas |
8 |
TPS Nandipur |
Gujranwala, Punjab |
567 |
Gas |
9 |
FBC Lakhra |
Lakhra, Sindh |
150 |
Coal |
10 |
Lal Pir Power |
Mehmood Kot, Punjab |
362 |
RFO |
11 |
Pak Gen. Power |
Mehmood Kot, Punjab |
365 |
RFO |
12 |
Altern Energy |
Fateh Jang, Punjab |
31 |
Gas |
13 |
Fauji Kabirwala |
Kabirwala, Punjab |
170 |
Gas |
14 |
Habibullah Coastal |
Quetta, Balochistan |
155 |
Gas |
15 |
Hub Power |
Hub, Balochistan |
1,292 |
RFO |
16 |
Japan Power |
Raiwind, Punjab |
120 |
|
17 |
KAPCO | Kot Addu, Punjab | 1,600 |
Gas |
18 |
Kohinoor Energy Ltd | Lahore, Punjab | 131 |
RFO |
19 |
Rousch Power |
Sidhnai, Punjab |
450 |
Gas |
20 |
Saba Power Company Ltd | Sheikhupura, Punjab | 136 |
RFO |
21 |
Southern Electric Power Company Ltd | Raiwind, Lahore | 117 |
RFO |
22 |
TNB Liberty Power |
Daharki, Sindh |
235 |
Gas |
23 |
Uch Power |
Murad Jamali, Balochistan |
586 |
Gas |
24 |
Attock Gen. |
Attock Morgah, Punjab |
165 |
RFO |
25 |
Atlas Power |
Sheikhupura, Punjab |
224 |
RFO |
26 |
Engro Power Gen. Qadirpur |
Qadirpur, Sindh |
227 |
Gas |
27 |
Saif Power |
Sahiwal, Punjab |
225 |
Gas |
28 |
Orient Power |
Balloki, Punjab |
225 |
Gas |
29 |
Nishat Power |
Qasur, Punjab |
202 |
RFO |
30 |
Nishat Chunian |
Qasur, Punjab |
202 |
RFO |
31 |
Sapphire Electric |
Muridke, Punjab |
235 |
Gas |
32 |
Halmore Power |
Bhikki, Punjab |
225 |
Gas |
33 |
Narowal Energy |
Narowal, Punjab |
214 |
RFO |
34 |
Liberty Power Tech. |
Faisalabad, Punjab |
202 |
RFO |
35 |
Foundation Power |
Daharki, Sindh |
179 |
Gas |
36 |
Davis Energen. |
Jhang, Punjab |
12 |
Gas |
37 |
Uch-II Power |
Murad Jamali, Balochistan |
404 |
Low BTU Gas |
38 |
Sahiwal Coal Power Plant |
Sahiwal, Punjab |
1,320 |
Bituminous Coal |
39 |
QATPL (Bhikki) |
Bhikki, Punjab |
1,231 |
RLNG |
40 |
NPPMCL (Haveli Bahadur Shah) |
HBS, Punjab |
1,277 |
RLNG |
41 |
NPPMCL (Balloki) |
Balloki, Punjab |
1,276 |
RLNG |
42 |
Port Qasim Electric Power |
Port Qasim, Sindh |
1,320 |
Bituminous Coal |
43 |
Reshma Power |
Raiwind, Punjab |
97 |
RFO/HSFO |
44 |
Gulf Powergen |
Gujranwala, Punjab |
84 |
RFO/HSFO |
45 |
China Power Hub |
Lasbella, Balochistan |
1,320 |
Imported Coal |
46 |
Engro Powergen Thar |
Tharparkar, Sindh |
660 |
Thar Coal |
47 |
Bin Qasim TPS-I |
Karachi, Sindh |
1,050 |
Dual |
48 |
Bin Qasim TPS-II |
Karachi, Sindh |
572 |
Dual |
49 |
Korangi Town GTPS-II |
Karachi, Sindh |
107 |
Gas |
50 |
Site GTPS-II |
Karachi, Sindh |
107 |
Gas |
51 |
Korangi CCPP |
Karachi, Sindh |
248 |
Gas |
52 |
Gul Ahmed |
Karachi, Sindh |
136 |
RFO |
53 |
Tapal Energy |
Karachi, Sindh |
126 |
RFO |
54 |
SNPCL-I (IPP-2002) |
Jamshoro, Sindh |
52 |
Gas |
55 |
SNPCL-II (IPP-2002) |
Jamshoro, Sindh |
52 |
Gas |
56 |
Anoud Power (IGC) |
Karachi, Sindh |
36 |
RFO/Gas |
57 |
Intl. Steel Limited (CPP) |
Karachi, Sindh |
19 |
Gas |
58 |
Intl. Ind. Limited (CPP) |
Karachi, Sindh |
4 |
Gas |
59 |
FFBL Power |
Karachi, Sindh |
52 |
Imported/Local Coal |
60 |
Lotte Chemicals |
Karachi, Sindh |
48 |
Gas |
61 |
Lucky Cement |
Lakki Marwat, KPK |
16 |
Gas |
62 |
Lucky Electric Power Co. Ltd |
Bin Qasim, Sindh |
660 |
Imported/Local Coal |
63 |
Punjab Thermal (PTPL) |
Jhang, Punjab |
1263 |
RLNG |
Under-Construction
S/N |
Station | Location | Capacity (MW) |
Primary Fuel | Notes |
1 |
Thal Nova Coal Power Project | Tharparkar, Sindh | 330 |
Thar coal | As of Dec 2021, 65% work Completed. Expected completion in Dec, 2022.[2] |
2 |
SSRL Thar coal Mine Mouth Power Plant |
Tharparkar, Sindh |
1320 |
Thar coal |
66% Completed. First Unit (660 MW) is targeted by Aug 2022
COD of complete project is targeted by Feb 2023.[3] |
3 |
Coal Power Project, Jamshoro |
Jamshoro, Sindh |
1,320 |
Imported + Thar coal |
First 660 MW unit is 91% completed and it's expected COD is in November 2022.[4] |
Nuclear
In service
References: [1][5]
S/N |
Station | Community | Capacity (MW) | Year in Service |
1 |
(CHASNUPP-1) | Mianwali, Punjab | 325 | 2000 |
2 |
(CHASNUPP-2) | Mianwali, Punjab | 325 | 2011 |
3 |
(CHASNUPP-3) | Mianwali, Punjab | 340 | 2016 |
4 |
(CHASNUPP-4) | Mianwali, Punjab | 340 | 2017 |
5 |
(KANUPP-2) | Karachi, Sindh | 1145 | 2021 |
6 |
(KANUPP-3) | Karachi, Sindh | 1145 |
2022 |
Hydro
In Service
References: [1]
S/N |
Station |
Location |
Type of Power Station |
Capacity (MW) |
In-Service year |
1 |
Renala |
Renala, Punjab |
Run of Canal |
1 |
1925 |
2 |
Malakand/Jabban |
Malakand, KPK |
Run of River |
22 |
1935 |
3 |
Rasul |
Mandi Bahauddin, Punjab |
Run of Canal |
22 |
1952 |
4 |
Dargai |
Malakand, KPK |
Run of Canal |
20 |
1952 |
5 |
Kurram Garhi |
Kurram Garhi, KPK |
Run of Canal |
4 |
1958 |
6 |
Chichonki Malian |
Sheikhupura, Punjab |
Run of Canal |
13 |
1959 |
7 |
Warsak |
Peshawar, KPK |
Run of River |
243 |
1960 |
8 |
Shadiwal |
Shadiwal Warriach, Punjab |
Run of Canal |
14 |
1961 |
9 |
Nandipur |
Gujranwala, Punjab |
Run of Canal |
14 |
1963 |
10 |
Mangla |
Mirpur, Azad Kashmir |
Reservoir |
1,000 |
1967 |
11 |
Chitral |
Chitral, KPK |
Run of Canal |
1 |
1975 |
12 |
Tarbela |
Tarbela, KPK |
Reservoir |
3,478 |
1977 |
13 |
Chashma |
Chashma, Punjab |
Run of River |
184 |
2000 |
14 |
Jagran |
Neelum, Azad Kashmir |
Hydro |
30 |
2000 |
15 |
Ghazi-Barotha |
Attock, Punjab |
Run of River |
1,450 |
2003 |
16 |
Malakand-III |
Malakand, KPK |
Run of River/Canal |
81 |
2008 |
17 |
Khan Khwar |
Shangla, KPK |
Reservoir |
72 |
2010 |
18 |
Pehur |
Swabi, KPK |
Canal Fall/Run of River |
18 |
2010 |
19 |
Jinnah |
Jinnah Barrage, Punjab |
Run of River |
96 |
2012 |
20 |
Garam Chashma |
Chitral, KPK |
Hydro |
1 |
2012 |
21 |
Allai Khwar |
Mansehra, KPK |
Reservoir |
121 |
2013 |
22 |
Gomal Zam |
South Waziristan |
Reservoir |
17 |
2013 |
23 |
Laraib Energy |
Jhelum River, AJ&K |
Hydro |
84 |
2013 |
24 |
Duber Khwar |
Kohistan, KPK |
Reservoir |
130 |
2014 |
25 |
Patrind Hydro |
Muzaffarabad, Azad Kashmir |
Run of River |
147 |
2017 |
26 |
Golen Gol |
Chitral, KPK |
Run of River |
108 |
2018 |
27 |
Neelum–Jhelum |
Muzaffarabad, Azad Kashmir |
Run of River |
969 |
2018 |
28 |
Marala Hydro (PPDCL) |
Sialkot, Punjab |
Canal Fall/Run of River |
8 |
2018 |
29 |
Tarbela 4th Ext. |
Tarbela, KPK |
Reservoir |
1,410 |
2019 |
30 |
Gulpur Hydro |
Gulpur, Azad Kashmir |
Run of River |
101 |
2020 |
31 |
Daral Khwar |
Swat District, KPK |
Run of River |
37 |
2021 |
32 |
Ranolia |
Kohistan, KPK |
High Head |
17 |
2021 |
33 |
Karot |
AJK/Punjab |
Run of River |
720 |
2022 |
Under-Construction
S/N |
Station |
Location |
Capacity (MW) |
Status |
1 |
Keyal Khwar |
Lower Kohistan, Khyber Pakhtunkhwa |
72 |
under construction[6] |
2 |
Dasu |
Dasu Town |
4,320 |
under construction. stage-I: 2,160 MW to be completed by April 2026.[7] |
3 |
Tarbela 5th Ext. |
Tarbela, KPK |
1,410 |
contracts of Civil and E&M works awarded. To be completed by May 2026.[8] |
4 |
Mohmand |
Mohmand Tribal District, KP |
800 |
under construction. To be completed by December 2025.[9] |
5 |
Diamer Basha |
Near Chilas, KP & GB |
4,500 |
under construction. To be completed by February 2029.[10] |
6 |
Kurram Tangi |
North Waziristan, KP |
83 |
under construction. 61% completed.[11] |
7 |
Suki Kinari |
Mansehra, KP |
884 |
70% work completed. To be completed by the end of 2022.[12] |
8 |
Mangla Refurbishment Project |
Mirpur, Azad Kashmir |
310 |
WAPDA has successfully commissioned two refurbished generating units of the Mangla Hydel Power Station, increasing their capacity from 200 to 270MW. Refurbishment of remaining units is under construction. Upon completion, it will enhance generation capacity of existing power stations from 1000MW to 1310MW.[13] |
Wind
In Service
References: [1]
S/N |
Station | Location | Capacity (MW) | In-service date |
1 |
Zorlu Enerji Pakistan (Pvt.) Ltd |
Thatta, Sindh | 56 | 2013 |
2 |
FFC Energy | Thatta, Sindh | 50 | 2013 |
3 |
Three Gorges First Wind Farm | Thatta, Sindh | 50 | 2014 |
4 |
Foundation Wind Energy – I | Thatta, Sindh | 50 | 2015 |
5 |
Foundation Wind Energy – II | Thatta, Sindh | 50 | 2015 |
6 |
Sapphire Wind |
Thatta, Sindh |
53 |
2015 |
7 |
Yunus Energy | Thatta, Sindh | 50 | 2016 |
8 |
Metro Power Company | Thatta, Sindh | 50 | 2016 |
9 |
Gul Ahmad Wind |
Thatta, Sindh |
50 |
2016 |
10 |
Master Wind Energy | Thatta, Sindh | 50 | 2016 |
11 |
Tenaga Generai | Thatta, Sindh | 50 | 2016 |
12 |
HydroChina Dawood Wind Power | Thatta, Sindh | 50 | 2017 |
13 |
Sachal Energy Development | Thatta, Sindh | 50 | 2017 |
14 |
United Energy Pakistan Wind Power | Thatta, Sindh | 99 | 2017 |
15 |
Artistic Wind Power | Thatta, Sindh | 50 | 2018 |
16 |
Act Wind (Tapal Wind) |
Thatta, Sindh |
30 |
2018 |
17 |
Hawa Energy | Thatta, Sindh | 50 | 2018 |
18 |
Jhampir Power |
Thatta, Sindh |
50 |
2018 |
19 |
Three Gorges Second Wind Farm |
Thatta, Sindh |
50 |
2018 |
20 |
Three Gorges Third Wind Farm |
Thatta, Sindh |
50 |
2018 |
21 |
Tricon Boston Consulting-A | Thatta, Sindh | 50 | 2019 |
22 |
Tricon Boston Consulting-B |
Thatta, Sindh |
50 |
2019 |
23 |
Tricon Boston Consulting-C |
Thatta, Sindh |
50 |
2019 |
24 |
Zephyr Power | Thatta, Sindh | 50 | 2019 |
25 |
Master Green Energy Pvt Ltd | Thatta, Sindh | 50 | 2022 |
26 |
Tricom Wind Power (Pvt.) Ltd. |
Thatta, Sindh |
50 |
2022 |
27 |
Din Energy Limited |
Thatta, Sindh |
50 |
2022 |
28 |
Lucky Renewables PVt. Ltd (TRICOM) |
Thatta, Sindh |
50 |
2022 |
29 |
Master Green Energy Ltd |
Thatta, Sindh |
50 |
2022 |
30 |
Act 2 Din Wind Pvt Ltd |
Thatta, Sindh |
50 |
2022 |
31 |
Artisitic Wind Power Pvt. Ltd |
Thatta, Sindh |
50 |
2022 |
32 |
Indus Wind Energy Limited |
Thatta, Sindh |
50 |
2022 |
33 |
Lakeside Energy |
Thatta, Sindh |
50 |
2022 |
34 |
Liberty Wind Power-1 |
Thatta, Sindh |
50 |
2022 |
35 |
Gul Ahmed Electric Limited |
Thatta, Sindh |
50 |
2022 |
36 |
Liberty Wind Power-II (Pvt.) Ltd |
Thatta, Sindh |
50 |
2022 |
37 |
NASDA Green Energy (Pvt) Limited |
Thatta, Sindh |
50 |
2022 |
38 |
Metro 2 Wind Power Limited |
Thatta, Sindh |
50 |
2022 |
Under-Construction
Reference:
S/N |
Station | Location | Capacity (MW) | Notes |
Solar
In service
References: [1]
S/N |
Station | Location | Capacity (MW) |
In-Service Date |
1 |
Quaid-e-Azam Solar Park | Bahawalpur, Punjab | 100 |
2015 |
2 |
Appolo Solar Development |
Bahawalpur, Punjab |
100 |
2016 |
3 |
Best Green Energy |
Bahawalpur, Punjab |
100 |
2016 |
4 |
Crest Energy |
Bahawalpur, Punjab |
100 |
2016 |
5 |
AJ Power Pvt. Ltd. | Khushab, Punjab | 12 |
2017 |
6 |
Harappa Solar Pvt. Ltd | Sahiwal, Punjab | 18 |
2017 |
7 |
Oursun Pakistan |
Thatta, Sindh |
50 |
2019 |
8 |
Gharo Solar |
Thatta, Sindh |
50 |
2020 |
9 |
Zhenfa Pakistan New Energy Company Limited |
Layyah, Punjab |
100 |
2022 |
Under-Construction
References:[1]
S/N |
Station | Location | Capacity (MW) |
Status |
1 |
Meridian Energy (Pvt.) Ltd |
Sukkur, Sindh |
50 |
Under Construction. Expected COD Feb, 2023. |
2 |
HND Energy (Pvt.) Limited |
Sukkur, Sindh |
50 |
3 |
Helios Power (Pvt.) Limited |
Sukkur, Sindh |
50 |
Bagasse / Biomass
In sevice
References: [1]
S/N |
Station | Community | Capacity (MW) |
In-Service Date |
1 |
Jamal Din Wali-II | Rahim Yar Khan, Punjab | 26 |
12 Jun, 2014 |
2 |
Jamal Din Wali-III | Rahim Yar Khan, Punjab | 27 |
3 Oct, 2014 |
3 |
RYK Mills | Rahim Yar Khan, Punjab | 40 |
24 Mar, 2015 |
4 |
Chiniot Power | Chiniot, Punjab | 63 |
28 Nov, 2015 |
5 |
Fatima Energy | Muzaffargarh, Punjab | 120 |
|
6 |
Hamza Sugar Mills | Rahim Yar Khan, Punjab | 15 |
Mar, 2017 |
7 |
The Thal Industries Corporation | Layyah, Punjab | 20 |
|
8 |
Almoiz Industries | Mianwali, Punjab | 36 |
Feb, 2019 |
9 |
Chanar Energy | Faisalabad, Punjab | 22 |
Feb, 2019 |
See also
- Energy portal
- Pakistan portal
- Electricity in Pakistan
- Energy policy of Pakistan
- List of power stations in Asia
- List of largest power stations in the world
- Iran–Pakistan–India gas pipeline
- Electricity sector in Pakistan
References
External links
Lists of power stations |
---|
By region | Africa | |
---|
Asia | |
---|
Europe | |
---|
North America |
- Antigua and Barbuda
- Bahamas
- Barbados
- Belize
- Canada
- Costa Rica
- Cuba
- Dominica
- Dominican Republic
- El Salvador
- Grenada
- Guatemala
- Haiti
- Honduras
- Jamaica
- Mexico
- Nicaragua
- Panama
- Saint Kitts and Nevis
- Saint Lucia
- Saint Vincent and the Grenadines
- Trinidad and Tobago
- United States
|
---|
Oceania |
- Australia
- Micronesia
- Fiji
- Kiribati
- Marshall Islands
- Nauru
- New Zealand
- Palau
- Papua New Guinea
- Samoa
- Solomon Islands
- Tonga
- Tuvalu
- Vanuatu
|
---|
South America | |
---|
|
---|
By type | Non-renewable |
- Coal
- Fuel oil
- Natural gas
- Nuclear
- Oil shale
|
---|
Renewable |
- Biomass
- Geothermal
- Hydroelectric
- conventional
- pumped-storage
- run-of-the-river
- tide
- Solar photovoltaic
- Solar thermal
- Wave
- Wind - Onshore
- Wind - Offshore
|
---|
|
---|
- Largest power stations
- Largest hydroelectric stations
- Least carbon-efficient stations
|
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2024
WikiSort.org - проект по пересортировке и дополнению контента Википедии