Jabban (Malakand-I) Hydropower Plant (MHPP-I) is a small, low-head, run-of-the-river hydroelectric power generation station of 22 megawatt generation capacity (four units of 5.5 MW each), located at Jabban, Malakand District, KPK province of Pakistan on the flows of Swat River and about 210 km from Pakistan's Capital Islamabad, 45 km from the city of Mardan and 7 km upstream of 20 MW Dargai Hydropower Plant (Malakand-II). It is a small hydel power generating plant constructed and put in commercial operation in July 1938 generating Average Annual yield of 122 million units (GWh) of least expensive electricity.[1][2]

Jabban Hydropower Plant (Malakand-I)
Location of Jabban Hydropower Plant (Malakand-I) in Pakistan
Official nameJabban Hydropower Plant (Malakand-I)
LocationMalakand District, KPK, Pakistan
Coordinates34°33′26.80″N 71°55′54.14″E
StatusOperational
Opening dateJuly 1938
Owner(s)Water and Power Development Authority (WAPDA)
Dam and spillways
Type of damrun-of-the-river
ImpoundsSwat River
Jabban Hydropower Plant (Malakand-I)
Operator(s)WAPDA
Commission dateJuly 1938
Turbines4 × 5.5 MW
Installed capacity22 MW
Annual generation122 million units (GWh)

Old Jabban Power Station


Since its commissioning in 1937 with an initial installed capacity of 9.6 MW (3 units of 3.2 MW each), and addition of 10 MW (2 units of 5.0 MW each), Jabban Hydro electric Power Station generated 5783.314 Gwh of cheap electricity till last day of its operation of Nov 12, 2011.


Fire incident


The 70-year-old power house was badly damaged due to a fire incident on 12-11-2006. The extent of damage was such that it was not possible to restore operation of the existing units. Moreover, the plant equipment had already outlived its life. The situation necessitated to carry out Rehabilitation of Jabban Hydroelectric Power Station on "Fast Track Basis" by installation of new machines of higher efficiency at the same site.

The Rehabilitation of the hydropower station was completed in 2013 with a total cost of Rs3.8 billion by the contractor HRL-CCPG JV (Habib Rafique Ltd. (Pakistan) & Central China Power Group China).[2]


Salient technical features



See also



References


  1. Development Portfolio Archived 2014-07-21 at the Wayback Machine. wapda.gov.pk
  2. Ongoing Projects Archived 2014-07-22 at the Wayback Machine. WAPDA. Retrieved on 2015-06-20.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии