|
---|
Nuclear |
- Akkuyu – 4,800 MW
- Sinop – 4,480 MW
| |
---|
Renewable energy | Geothermal |
- Gümüşköy – 13 MW
- Kızıldere – 95 MW
|
---|
Hydroelectric | |
---|
Solar |
- Greenway CSP Mersin – 6 MW
- Karapınar – 1,000 MW
|
---|
Waste |
- Istanbul Waste Power Plant
|
---|
Wind | |
---|
|
---|
Thermal | Coal-fired |
- Afşin-Elbistan C – 1800 MW proposed
- Afşin-Elbistan B – 1440 MW
- ZETES-3 – 1400 MW
- Afşin-Elbistan A – 1355 MW
- Cenal – 1320 MW
- Emba Hunutlu – 1320 MW under construction
- İsken Sugözü – 1308 MW
- ZETES-2 – 1230 MW
- Atlas – 1200 MW
- Bekirli – 1200 MW
- Soma – 990 MW
- Kemerköy – 653 MW
- Yatağan – 630 MW
- Çayırhan – 620 MW
- Seyitömer – 600 MW
- Soma Kolin – 510 MW
- Kangal – 457 MW
- Tufanbeyli – 450 MW
- Yeniköy – 420 MW
- Biga – 405 MW
- Şırnak Silopi – 405 MW
- Tunçbilek – 365 MW
- İzdemir – 350 MW
- Çan-2 – 330 MW
- 18 Mart Çan – 320 MW
- Çatalağzı – 315 MW
- Bolu Göynük – 270 MW
- Orhaneli – 210 MW
- Çolakoğlu – 190 MW
- ZETES-1 – 160 MW
- List of active coal-fired
- Silahtarağa – now museums
|
---|
Natural gas-fired |
- Gebze - 1540 MW
- Unimar Marmara Ereğlisi – 480 MW
|
---|
|
---|
Power stations projected or under construction in italics |