energy.wikisort.org - Power_plantThe Aliağa Wind Farm (Turkish: Aliağa Rüzgâr Enerji Santralı) is an onshore wind power plant located in Aliağa district of İzmir Province in western Turkey.
Aliağa Wind Farm |
---|
 |
Official name | Aliağa Rüzgâr Enerji Santrali |
---|
Country | Turkey |
---|
Location | Aliağa, İzmir Province |
---|
Coordinates | 38.91882°N 27.18893°E / 38.91882; 27.18893 |
---|
Status | Operational |
---|
|
Type | onshore |
---|
Hub height | 80 m (260 ft) |
---|
Rotor diameter | 90 m (300 ft), 70 m (230 ft) |
---|
|
|
|
Make and model | Nordex (53): Nordex N90/2500 Enercon (30): Enercon E70/2000 |
---|
Nameplate capacity | 193 MW |
---|
Annual net output | 481 GWh |
---|
|
The wind farm consists of four fields operated by different companies. A total of 83 wind turbines have an installed output power of 193 MW generating an average annual electric energy of 481 GWh. Currently, the wind farm is the country's largest one.[1]
Technical details
- Wind Farm Yurtdağ consists of 17 turbines of type Nordex N90/2500 each with 90 m (300 ft) rotor diameter generating 2.5 MW power. Total installed power is 42.5 MW. Operated by Innores company.[2]
- Wind Farm 2 consists of 15 turbines of type Enercon E70/2000 each with 70 m (230 ft) rotor diameter generating 2.0 MW power. Total installed power is 30.0 MW. Operated by Doruk company.
- Wind Farm Atçılar consists of 36 turbines of type Nordex. Total installed power is 90.0 MW. In service since April 2010, the field is operated by Yapısan company.[3]
- Wind Farm 4 consists of 15 turbines of type Enercon. Total installed power is 30.0 MW. Operated by Doğal company.[1]
References
Turkey portal
Weather portal
Renewable energy portal
|
---|
Nuclear |
- Akkuyu – 4,800 MW
- Sinop – 4,480 MW
| |
---|
Renewable energy | Geothermal |
- Gümüşköy – 13 MW
- Kızıldere – 95 MW
|
---|
Hydroelectric | |
---|
Solar |
- Greenway CSP Mersin – 6 MW
- Karapınar – 1,000 MW
|
---|
Waste |
- Istanbul Waste Power Plant
|
---|
Wind | |
---|
|
---|
Thermal | Coal-fired |
- Afşin-Elbistan C – 1800 MW proposed
- Afşin-Elbistan B – 1440 MW
- ZETES-3 – 1400 MW
- Afşin-Elbistan A – 1355 MW
- Cenal – 1320 MW
- Emba Hunutlu – 1320 MW under construction
- İsken Sugözü – 1308 MW
- ZETES-2 – 1230 MW
- Atlas – 1200 MW
- Bekirli – 1200 MW
- Soma – 990 MW
- Kemerköy – 653 MW
- Yatağan – 630 MW
- Çayırhan – 620 MW
- Seyitömer – 600 MW
- Soma Kolin – 510 MW
- Kangal – 457 MW
- Tufanbeyli – 450 MW
- Yeniköy – 420 MW
- Biga – 405 MW
- Şırnak Silopi – 405 MW
- Tunçbilek – 365 MW
- İzdemir – 350 MW
- Çan-2 – 330 MW
- 18 Mart Çan – 320 MW
- Çatalağzı – 315 MW
- Bolu Göynük – 270 MW
- Orhaneli – 210 MW
- Çolakoğlu – 190 MW
- ZETES-1 – 160 MW
- List of active coal-fired
- Silahtarağa – now museums
|
---|
Natural gas-fired |
- Gebze - 1540 MW
- Unimar Marmara Ereğlisi – 480 MW
|
---|
|
---|
Power stations projected or under construction in italics |
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии