Cindere Dam is a gravity dam on the Büyük Menderes River in Denizli Province, Turkey. The development was backed by the Turkish State Hydraulic Works.
| Cindere Dam | |
|---|---|
| Location | Turkey |
| Construction began | 1994 |
| Opening date | 2007 |
| Dam and spillways | |
| Height | 78 m (256 ft) |
| Reservoir | |
| Total capacity | 82,000,000 m3 (66,478 acre⋅ft) |
| Power Station | |
| Installed capacity | 29 MW |
| Annual generation | 88 GWh |
| |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Nuclear |
| ||||||||||
| Renewable energy |
| ||||||||||
| Thermal |
| ||||||||||
Power stations projected or under construction in italics | |||||||||||
This article about a dam, floodgate or hydroelectric station in Turkey is a stub. You can help Wikipedia by expanding it. |