energy.wikisort.org - Power_plantThe Burç Bendi Dam is a gravity dam on the Göksu River (a tributary of the Euphrates), near the village of Burç in Adıyaman district, Adıyaman Province, Turkey. Its primary purpose is hydroelectric power generation and it supports a 27.9 MW run-of-the-river power station. Construction on the dam began in January 2008 and it was fully operational by 3 November 2010. The 57 m (187 ft) tall concrete dam withholds a reservoir of 26,600,000 m3 (21,600 acre⋅ft). Water is diverted through a 536 m (1,759 ft) long tunnel to the power station downstream which contains three 9.3 vertical Kaplan turbine-generators.[1] It is owned and operated by ČEZ Group.[2]
Dam in Adıyaman district, Adıyaman Province
Burç Bendi Dam |
---|
Location of Burç Bendi Dam in Turkey |
Country | Turkey |
---|
Location | Burç, Adıyaman district, Adıyaman Province |
---|
Coordinates | 37°28′6.45″N 38°10′14.44″E |
---|
Purpose | Power |
---|
Status | Operational |
---|
Construction began | January 2008 |
---|
Opening date | November 2010 |
---|
Owner(s) | ČEZ Group |
---|
|
Type of dam | Gravity |
---|
Impounds | Peri River |
---|
Height (foundation) | 47 m (154 ft) |
---|
Length | 152.5 m (500 ft) |
---|
Dam volume | 67,000 m3 (88,000 cu yd) |
---|
|
Total capacity | 26,600,000 m3 (21,600 acre⋅ft) |
---|
|
Coordinates | 37°27′48.95″N 38°10′18.32″E |
---|
Commission date | 2010 |
---|
Type | Run-of-the-river |
---|
Hydraulic head | 29.19 m (95.8 ft) (rated) |
---|
Turbines | 3 x 9.3 MW vertical Kaplan-type |
---|
Installed capacity | 27.9 MW |
---|
Annual generation | 44.13 GWh |
---|
See also
Turkey portal
Water portal
Renewable energy portal
References
|
---|
Nuclear |
- Akkuyu – 4,800 MW
- Sinop – 4,480 MW
| |
---|
Renewable energy | Geothermal |
- Gümüşköy – 13 MW
- Kızıldere – 95 MW
|
---|
Hydroelectric | |
---|
Solar |
- Greenway CSP Mersin – 6 MW
- Karapınar – 1,000 MW
|
---|
Waste |
- Istanbul Waste Power Plant
|
---|
Wind | |
---|
|
---|
Thermal | Coal-fired |
- Afşin-Elbistan C – 1800 MW proposed
- Afşin-Elbistan B – 1440 MW
- ZETES-3 – 1400 MW
- Afşin-Elbistan A – 1355 MW
- Cenal – 1320 MW
- Emba Hunutlu – 1320 MW under construction
- İsken Sugözü – 1308 MW
- ZETES-2 – 1230 MW
- Atlas – 1200 MW
- Bekirli – 1200 MW
- Soma – 990 MW
- Kemerköy – 653 MW
- Yatağan – 630 MW
- Çayırhan – 620 MW
- Seyitömer – 600 MW
- Soma Kolin – 510 MW
- Kangal – 457 MW
- Tufanbeyli – 450 MW
- Yeniköy – 420 MW
- Biga – 405 MW
- Şırnak Silopi – 405 MW
- Tunçbilek – 365 MW
- İzdemir – 350 MW
- Çan-2 – 330 MW
- 18 Mart Çan – 320 MW
- Çatalağzı – 315 MW
- Bolu Göynük – 270 MW
- Orhaneli – 210 MW
- Çolakoğlu – 190 MW
- ZETES-1 – 160 MW
- List of active coal-fired
- Silahtarağa – now museums
|
---|
Natural gas-fired |
- Gebze - 1540 MW
- Unimar Marmara Ereğlisi – 480 MW
|
---|
|
---|
Power stations projected or under construction in italics |
На других языках
[de] Burç-Bendi-Talsperre
Die Burç-Bendi-Talsperre befindet sich 10 km westlich des Atatürk-Staudamms in der Provinz Adıyaman (Südost-Türkei). Sie liegt am Fluss Göksu – etwa 8 km oberhalb dessen Mündung in den Euphrat.
- [en] Burç Bendi Dam
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии