| Kavşak Bendi Dam |
|---|
Location of Kavşak Bendi Dam in Turkey |
| Official name | Kavşak Bendi Barajı ve HES |
|---|
| Country | Turkey |
|---|
| Location | Kozan/Aladağ |
|---|
| Coordinates | 37°33′45.28″N 35°31′45.84″E |
|---|
| Status | Operational |
|---|
| Construction began | 2008 |
|---|
| Opening date | 2013 |
|---|
| Owner(s) | Enerjisa Power Generation Inc. |
|---|
|
| Type of dam | Embankment, concrete-face rock-fill |
|---|
| Impounds | Seyhan River |
|---|
| Height (foundation) | 88 m (289 ft) |
|---|
| Height (thalweg) | 73 m (240 ft) |
|---|
| Length | 186 m (610 ft) |
|---|
| Elevation at crest | 323 m (1,060 ft) |
|---|
| Width (crest) | 8 m (26 ft) |
|---|
| Dam volume | 1,215,000 m3 (1,589,160 cu yd) |
|---|
| Spillway type | Controlled |
|---|
| Spillway capacity | 5,053 m3/s (178,400 cu ft/s) |
|---|
|
| Creates | Kavşak Bendi Reservoir |
|---|
| Total capacity | 30,000,000 m3 (24,321 acre⋅ft) |
|---|
| Active capacity | 7,560,000 m3 (6,129 acre⋅ft) |
|---|
| Catchment area | 13,200 km2 (5,097 sq mi) |
|---|
| Surface area | 1.42 km2 (1 sq mi) |
|---|
| Maximum length | 11 km (7 mi) |
|---|
| Normal elevation | 318 m (1,043 ft) |
|---|
|
| Coordinates | 37°32′19.83″N 35°31′29.90″E |
|---|
| Commission date | 2013-2014 |
|---|
| Type | Conventional, diversion |
|---|
| Hydraulic head | 84.81 m (278 ft) (net) |
|---|
| Turbines | 3 x 59 MW Francis-type |
|---|
| Installed capacity | 177 MW[1] |
|---|
| Annual generation | 741 Gwh |
|---|