energy.wikisort.org - Power_plantDağpazarı Wind Farm is a wind power plant consisting of 13 wind turbines in Dağpazarı in the Taurus Mountains in the Mut district of Mersin Province, southern Turkey. It came online in 2012.[1][2]
Wind power plant in Turkey
Dağpazarı Wind Farm |
---|
 Windfarm from west |
 |
Official name | Dağpazarı Rüzgâr Enerji Santrali |
---|
Country | Turkey |
---|
Location | Dağpazarı, Mut, Mersin Province |
---|
Coordinates | 36°50′N 33°28′E |
---|
Status | Operational |
---|
Construction began | April 2012 |
---|
Commission date | May 20, 2012; 10 years ago (2012-05-20) |
---|
Operator(s) | Enerjisa |
---|
|
Type | onshore |
---|
|
|
|
Units operational | 13 |
---|
Make and model | Siemens Wind Power |
---|
Nameplate capacity | 13 X 3 MW |
---|
Annual net output | 129 GWh |
---|
|
Geography
The wind farm is located on the Taurus Mountains, northeast of Mut, at a distance of 35 km (22 mi) to Mut and 195 km (121 mi) to Mersin.
Technical details
Maximum power output of each of the 13 turbines supplied by Siemens Wind Power is 3 MW and the total annual energy production is about 129 GWh.[1][2][3]
See also
Turkey portal
Weather portal
Renewable energy portal
References
|
---|
Nuclear |
- Akkuyu – 4,800 MW
- Sinop – 4,480 MW
| |
---|
Renewable energy | Geothermal |
- Gümüşköy – 13 MW
- Kızıldere – 95 MW
|
---|
Hydroelectric |
- Adıgüzel – 62 MW
- Akköprü – 115 MW
- Aksu – 13 MW
- Alaköprü – 26 MW
- Alkumru – 265.5 M
- Almus – 27 MW
- Alpaslan-1 – 160 MW
- Alpaslan-2 – 280 MW
- Altınkaya – 700 MW
- Arkun – 237 MW
- Artvin – 340 MW
- Aslantaş – 138 MW
- Atasu – 5 MW
- Atatürk – 2,400 MW
- Bahçelik – 7 MW
- Batman – 160 MW
- Berdan – 10 MW
- Berke – 510 MW
- Birecik – 672 MW
- Borçka – 300 MW
- Boyabat – 513 MW
- Burç Bendi – 27.9 MW
- Çamlıgöze – 33 MW
- Çatalan – 169 MW
- Çetin – 405 MW
- Çınarcık – 100 MW
- Cindere – 29 MW
- Çine – 47 MW
- Cizre −240 MW
- Demirköprü – 69 MW
- Derbent – 58 MW
- Deriner – 670 MW
- Devecikonağı – 29 MW
- Dicle – 110 MW
- Ermenek – 300 MW
- Garzan – 49 MW
- Gezende – 159 MW
- Gökçekaya – 278 MW
- Gönen – 11 MW
- Güllübağ – 96 MW
- Gürsöğüt −242 MW
|
---|
Solar |
- Greenway CSP Mersin – 6 MW
- Karapınar – 1,000 MW
|
---|
Waste |
- Istanbul Waste Power Plant
|
---|
Wind |
- Aliağa – 193 MW
- Bahçe – 135 MW
- Çanta – 47.5 MW
- Dağpazarı – 39 MW
- Mut – 33 MW
- Şamlı – 174 MW
- Soma – 140.4 MW
|
---|
|
---|
Thermal | Coal-fired |
- Afşin-Elbistan C – 1800 MW proposed
- Afşin-Elbistan B – 1440 MW
- ZETES-3 – 1400 MW
- Afşin-Elbistan A – 1355 MW
- Cenal – 1320 MW
- Emba Hunutlu – 1320 MW under construction
- İsken Sugözü – 1308 MW
- ZETES-2 – 1230 MW
- Atlas – 1200 MW
- Bekirli – 1200 MW
- Soma – 990 MW
- Kemerköy – 653 MW
- Yatağan – 630 MW
- Çayırhan – 620 MW
- Seyitömer – 600 MW
- Soma Kolin – 510 MW
- Kangal – 457 MW
- Tufanbeyli – 450 MW
- Yeniköy – 420 MW
- Biga – 405 MW
- Şırnak Silopi – 405 MW
- Tunçbilek – 365 MW
- İzdemir – 350 MW
- Çan-2 – 330 MW
- 18 Mart Çan – 320 MW
- Çatalağzı – 315 MW
- Bolu Göynük – 270 MW
- Orhaneli – 210 MW
- Çolakoğlu – 190 MW
- ZETES-1 – 160 MW
- List of active coal-fired
- Silahtarağa – now museums
|
---|
Natural gas-fired |
- Gebze - 1540 MW
- Unimar Marmara Ereğlisi – 480 MW
|
---|
|
---|
Power stations projected or under construction in italics |
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии