The Sırımtaş Dam is a gravity dam and one of the 22 dams of the Southeastern Anatolia Project. It is located on the Birimşe River near the town of Alancık in Adıyaman Province, Turkey. Construction on the 92 m (302 ft) tall dam began in 2009 and was completed in May 2013. The primary purpose of the dam is hydroelectric power production and its power station has a 28 MW installed capacity.[1][2][3]

Sırımtaş Dam
Location of Sırımtaş Dam in Turkey
Official nameSırımtaş Baraji
LocationAlancık, Adıyaman Province, Turkey
Coordinates38°01′48.3″N 38°33′23.3″E
PurposePower
StatusOperational
Construction began2009
Opening date2013
Dam and spillways
Type of damGravity, roller-compacted concrete
ImpoundsBirimşe River
Height92 m (302 ft)
Reservoir
CreatesSırımtaş Reservoir
Sırımtaş HES
Coordinates37°59′50.3″N 38°32′43.1″E
Operator(s)Tektuğ Electric Manufacturing Co., Ltd
Installed capacity28 MW
Annual generation87 GWh

References


  1. "Sırımtaş Dam and HEPP" (in Turkish). Yolsu. Retrieved 27 May 2013.
  2. "Hydroelectric Power Plants Growing With Sincik" (in Turkish). Sinick Gov't. Retrieved 27 May 2013.
  3. "SIRIMTAŞ DAM AND HEPP - ADIYAMAN" (in Turkish). Sangari. Retrieved 27 May 2013.
Map all coordinates using: OpenStreetMap 
Download coordinates as: KML

На других языках


- [en] Sırımtaş Dam

[fr] Barrage de Sirimtas

Le barrage de Sirimtas est un barrage prévu dans le projet d'Anatolie du Sud-est du gouvernement de la Turquie. Le projet fut commencé en 2009 pour être complété en mai 2013.



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии