The Sır Dam is an arch dam on the Ceyhan River in Kahramanmaraş Province of southern Turkey. There is a hydroelectric power plant, established in 1991, at the dam, with a power output of 285 MW.[1]

Sır Dam
Location of Sır Dam in Turkey
Official nameSır Baraji
CountryTurkey
LocationKahramanmaraş Province
Coordinates37°30′2.9″N 36°35′45.35″E
StatusOperational
Construction began1987
Opening date1991
Dam and spillways
Type of damConcrete arch
Height116 m (381 ft)
Dam volume494,000 m3 (646,128 cu yd)
Reservoir
Total capacity1,120,000,000 m3 (907,999 acre⋅ft)
Surface area48 km2 (19 sq mi)
Power Station
TypeConventional
Turbines3 x 95 MW Francis-type
Installed capacity285 MW
Annual generation725 GWh

Involuntary Resettlement


According to Terminski (2013), the construction of the dam resulted in involuntary resettlement of approximately 45,000 people.[2]


References


  1. "Sir Dam". State Hydraulic Works. Retrieved 25 November 2011.
  2. Bogumil Terminski, (2013). Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges, Geneva, 2013.



На других языках


[de] Sır-Talsperre

Die Sır-Talsperre liegt am Ceyhan in der Südost-Türkei etwa 30 km westlich der Provinzhauptstadt Kahramanmaraş in der gleichnamigen Provinz.
- [en] Sır Dam



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии