energy.wikisort.org - Power_plantThe Arkun Dam an embankment dam on the Çoruh River near İspir in Erzurum Province, Turkey. Construction began in 2011 and the primary purpose of the dam is hydroelectric power generation. It is part of the Çoruh Development Plan and its construction is being supervised by Turkey's State Hydraulic Works. The dam and power plant were completed early, in June 2014. Water from the dam's reservoir supplies two power stations; one at the dam's toe (base) (11.92 MW) and the other downstream (225 MW) in Artvin Province.[1][3]
Dam in İspir, Erzurum Province
Arkun Dam |
---|
 |
Location of Arkun Dam in Turkey |
Country | Turkey |
---|
Location | İspir, Erzurum Province |
---|
Coordinates | 40°40′34.25″N 41°17′21.09″E |
---|
Purpose | Power |
---|
Status | Operational |
---|
Construction began | 2011 |
---|
Opening date | 2014 |
---|
Owner(s) | State Hydraulic Works |
---|
|
Type of dam | Embankment, earth-fill |
---|
Impounds | Çoruh River |
---|
Height (foundation) | 188 m (617 ft) |
---|
Height (thalweg) | 140 m (459 ft) |
---|
Dam volume | 6,774,345 m3 (8,860,509 cu yd) |
---|
|
Catchment area | 6,853 km2 (2,646 sq mi) |
---|
|
Commission date | June 2014 |
---|
Hydraulic head | Downstream: 225 m (738 ft) (gross)[1] Toe: 225 m (738 ft) 121 m (397 ft) (nominal)[2] |
---|
Turbines | Downstream: 3 x 75 MW Francis-type Toe: 2 x 5.96 MW Francis-type |
---|
Installed capacity | 236.92 MW |
---|
Annual generation | 788 GWh (estimate) |
---|
See also
Turkey portal
Water portal
Renewable energy portal
References
|
---|
Nuclear |
- Akkuyu – 4,800 MW
- Sinop – 4,480 MW
| |
---|
Renewable energy | Geothermal |
- Gümüşköy – 13 MW
- Kızıldere – 95 MW
|
---|
Hydroelectric | |
---|
Solar |
- Greenway CSP Mersin – 6 MW
- Karapınar – 1,000 MW
|
---|
Waste |
- Istanbul Waste Power Plant
|
---|
Wind | |
---|
|
---|
Thermal | Coal-fired |
- Afşin-Elbistan C – 1800 MW proposed
- Afşin-Elbistan B – 1440 MW
- ZETES-3 – 1400 MW
- Afşin-Elbistan A – 1355 MW
- Cenal – 1320 MW
- Emba Hunutlu – 1320 MW under construction
- İsken Sugözü – 1308 MW
- ZETES-2 – 1230 MW
- Atlas – 1200 MW
- Bekirli – 1200 MW
- Soma – 990 MW
- Kemerköy – 653 MW
- Yatağan – 630 MW
- Çayırhan – 620 MW
- Seyitömer – 600 MW
- Soma Kolin – 510 MW
- Kangal – 457 MW
- Tufanbeyli – 450 MW
- Yeniköy – 420 MW
- Biga – 405 MW
- Şırnak Silopi – 405 MW
- Tunçbilek – 365 MW
- İzdemir – 350 MW
- Çan-2 – 330 MW
- 18 Mart Çan – 320 MW
- Çatalağzı – 315 MW
- Bolu Göynük – 270 MW
- Orhaneli – 210 MW
- Çolakoğlu – 190 MW
- ZETES-1 – 160 MW
- List of active coal-fired
- Silahtarağa – now museums
|
---|
Natural gas-fired |
- Gebze - 1540 MW
- Unimar Marmara Ereğlisi – 480 MW
|
---|
|
---|
Power stations projected or under construction in italics |
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии