energy.wikisort.org - Power_plantStarfish Hill Wind Farm is a wind power station spread over two hills near Cape Jervis, South Australia. It has 22 wind turbines, eight on Starfish Hill itself and 14 on Salt Creek Hill, with a combined generating capacity of 33 MW of electricity.
| Starfish Hill Wind Farm |
|---|
 |
 |
| Country | Australia |
|---|
| Coordinates | 35.5843°S 138.1402°E / -35.5843; 138.1402 |
|---|
| Commission date | September 2003 (2003-09) |
|---|
| Construction cost | $65 million |
|---|
| Owner(s) | RATCH-Australia |
|---|
|
| Type | Onshore |
|---|
| Hub height | 68 m (223 ft) |
|---|
| Rotor diameter | 64 m (210 ft) |
|---|
|
|
|
| Units operational | 22 |
|---|
| Make and model | NEG Micon: NM64C |
|---|
| Nameplate capacity | 33 MW |
|---|
| Annual net output | 100 GWh |
|---|
|
| Commons | Related media on Commons |
|---|
|
Starfish Hill Wind Farm was commissioned in September 2003, making it the first major wind farm in the state.[1] On 30 October 2010, one of the original 23 turbines caught fire and was destroyed. It was not replaced, leaving the wind farm with 22 turbines.[2]
Starfish Hill Wind Farm was developed by Tarong Energy at a cost of $65 million. RATCH-Australia (at that time part of Transfield Services) acquired the wind farm in December 2007.[1][3]
See also
South Australia portal
Weather portal
Renewable energy portal
References
Energy in South Australia |
|---|
| Coal | | Closed |
- Playford A
- Playford B
- Northern
|
|---|
|
|---|
| Gas or diesel | | Proposed | |
|---|
| Under construction | |
|---|
| Operating |
- Angaston
- Barker Inlet
- Dry Creek
- Hallett
- Kangaroo Island
- Ladbroke Grove
- Lonsdale
- Mintaro
- Osborne
- Pelican Point
- Port Lincoln
- Port Stanvac
- Quarantine
- Snuggery
- Torrens Island
|
|---|
| Closed |
- Temporary Generation North
- Temporary Generation South
|
|---|
|
|---|
| Solar | | Proposed |
- Coober Pedy (off-grid)
- Aurora (cancelled)
- Cultana
- Riverland (cancelled)
- Solar River
|
|---|
| Under construction | |
|---|
| Operating |
- Bungala
- Morgan Whyalla pipeline
- Sundrop Farms (off-grid)
- Tailem Bend
|
|---|
| Closed | |
|---|
|
|---|
| Wind | | Under construction | |
|---|
| Operating | |
|---|
|
|---|
| Hydro | |
|---|
| Storage |
- Hornsdale Power Reserve
- Dalrymple ESCRI battery
- Lake Bonney Battery Energy Storage System
|
|---|
| Companies |
- Adelaide Electric Supply Company
- ElectraNet
- Electricity Trust of South Australia
- SAGASCO
- SA Power Networks
- Santos
|
|---|
| Interconnectors |
- Heywood interconnector
- Murraylink
- Project EnergyConnect
|
|---|
| Other |
- Australian Energy Market Operator
- Electricity Supply Industry Planning Council
- Essential Services Commission of South Australia
- 2016 South Australian blackout
|
|---|
|
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2026
WikiSort.org - проект по пересортировке и дополнению контента Википедии