Kennedy Energy Park is a wind, solar and storage hybrid power station approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.
Kennedy Energy Park | |
---|---|
![]() | |
Country |
|
Coordinates | 21°S 145°E |
Status | Proposed |
Construction began | 2018 |
Owner(s) | Windlab |
Solar farm | |
Type | Flat-panel PV |
Wind farm | |
Type | Onshore |
Site usage | Farm Land |
Rotor diameter |
|
Power generation | |
Units planned | 12 × 3.45 MW |
Nameplate capacity | 50 MW |
External links | |
Website | kennedyenergypark |
Stage one of the project is a “proof-of-concept” commenced construction 2018, consisting of 30 MW of wind turbines, 20 MW of single axis tracking Solar Panels, and 2 MW of Li ion battery storage, costing $120 million to build and expected to be operational in 2020.[1] It was constructed in 2018 but did not start to connect to the grid until July 2021.[2] It is intended that the combination of solar and wind generation will be complementary and lead to stable output.[3]
Stage two is proposed to be capable of producing 1200 MW of renewable energy, costing $2 billion and was hoped to commence construction before the end of 2020.[4]
Wind farms in Australia | ||
---|---|---|
New South Wales | ||
Queensland | ||
South Australia | ||
Tasmania | ||
Victoria |
| |
Western Australia | ||
Proposed wind farms | ||
|
Energy in Queensland | |
---|---|
Proposed power stations | |
Coal | |
Gas/kerosene |
|
Major Hydro |
|
Minor Hydro |
|
Wind Farms |
|
Solar Power Stations |
|
Companies |
|
Regulators |
|
Market Operator |
|
Historical |
|