energy.wikisort.org - Power_plantTerminal Storage Mini Hydro is the name of an electricity generator operating in the supply pipes for Adelaide's water supply in South Australia. The facility is installed at Tea Tree Gully and uses a stainless steel turbine in the gravity-powered supply pipes. It was developed by SA Water who own and operate the water distribution with experience from Hydro Tasmania. When it was installed, it had a capacity of 1.9 megawatts (2,500 hp).[1] It has been upgraded to now provide 3 megawatts (4,000 hp).[2]
Terminal Storage Mini Hydro |
---|
 |
Country | Australia |
---|
Location | Hope Valley, South Australia |
---|
Coordinates | 34°50′46.9″S 138°41′10.8″E |
---|
Commission date | October 2003 |
---|
Owner(s) | SA Water |
---|
Operator(s) | |
---|
|
Nameplate capacity | 3 MW |
---|
Annual net output | 4762 MW·h (2012) |
---|
|
Hydro Tasmania and SA Water are equal partners in the joint venture which opened in October 2003.[3][4] In 2011–12, it generated 4,762 megawatt-hours (17,140 GJ) of electricity.[5]
References
Energy in South Australia |
---|
Coal | Closed |
- Playford A
- Playford B
- Northern
|
---|
|
---|
Gas or diesel | Proposed | |
---|
Under construction | |
---|
Operating |
- Angaston
- Barker Inlet
- Dry Creek
- Hallett
- Kangaroo Island
- Ladbroke Grove
- Lonsdale
- Mintaro
- Osborne
- Pelican Point
- Port Lincoln
- Port Stanvac
- Quarantine
- Snuggery
- Torrens Island
|
---|
Closed |
- Temporary Generation North
- Temporary Generation South
|
---|
|
---|
Solar | Proposed |
- Coober Pedy (off-grid)
- Aurora (cancelled)
- Cultana
- Riverland (cancelled)
- Solar River
|
---|
Under construction | |
---|
Operating |
- Bungala
- Morgan Whyalla pipeline
- Sundrop Farms (off-grid)
- Tailem Bend
|
---|
Closed | |
---|
|
---|
Wind | Under construction | |
---|
Operating | |
---|
|
---|
Hydro | |
---|
Storage |
- Hornsdale Power Reserve
- Dalrymple ESCRI battery
- Lake Bonney Battery Energy Storage System
|
---|
Companies |
- Adelaide Electric Supply Company
- ElectraNet
- Electricity Trust of South Australia
- SAGASCO
- SA Power Networks
- Santos
|
---|
Interconnectors |
- Heywood interconnector
- Murraylink
- Project EnergyConnect
|
---|
Other |
- Australian Energy Market Operator
- Electricity Supply Industry Planning Council
- Essential Services Commission of South Australia
- 2016 South Australian blackout
|
---|
|
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии