energy.wikisort.org - Power_plantUwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.[1]
Dam in Kaneyama
Uwada Dam |
---|
 |
Location of Uwada Dam in Japan |
Country | Japan |
---|
Location | Kaneyama |
---|
Coordinates | 37°28′59″N 139°32′14″E |
---|
Construction began | 1952 |
---|
Opening date | 1954 |
---|
Owner(s) | Tohoku Electric Power |
---|
|
Impounds | Tadami River |
---|
Height | 34 m (112 ft) |
---|
Length | 283 m (928 ft) |
---|
Dam volume | 23,000 m3 (30,083 cu yd) |
---|
Spillway type | 5 x roller gates |
---|
|
Total capacity | 20,500,000 m3 (16,620 acre⋅ft) |
---|
Active capacity | 4,426,000 m3 (3,588 acre⋅ft) |
---|
Catchment area | 2,402 km2 (927 sq mi) |
---|
Surface area | 1.52 km2 (376 acres) |
---|
|
Commission date | March 1954 |
---|
Hydraulic head | 26.3 m (86 ft) |
---|
Turbines | 3 x 21.3 MW Kaplan-type |
---|
Installed capacity | 63.9 MW |
---|
See also
Japan portal
Water portal
Renewable energy portal
References
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии