The Tymień Wind Farm is a group of wind turbines located in the vicinity of Tymień, West Pomeranian Voivodeship near Kołobrzeg, in Koszalin County.

Tymień Wind Farm
Official namePark Wiatrowy Tymień
CountryPoland
LocationTymień, West Pomeranian Voivodeship
Coordinates54°12′02″N 15°51′08″E
StatusOperational
Commission date2005
Owner(s)Energa
Operator(s)Koszalin Power Plant
External links
CommonsRelated media on Commons

The investment cost amounted to PLN 235 million zł. The recipient of energy is Koszalin Power Plant forming part of the group Energa. Built in 2006, by 2008 it was the largest wind farm in the country, with power up to 50 MW, higher than the open in 2003 wind farm in Zagórze near Wolin 30 MW. Currently, the largest wind park in Poland is the Margonin wind farm of 120 MW (60 wind turbines, each with a capacity of 2.0 MW), developed by the company Neolica Poland Sp. z oo owned by Energias de Portugal (EdP).


Specifications



See also



References






Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии