The Shoalhaven Scheme is a dual-purpose water supply and Pumped-storage Hydroelectricity scheme located on the South Coast region of New South Wales, Australia.
The Scheme was built as a joint project between the Electricity Commission of NSW and the NSW Metropolitan Water Sewerage and Drainage Board. Management has subsequently passed to Origin Energy and the Sydney Catchment Authority.
Water supply
Water in the scheme is stored in three principal dams and their associated reservoirs: Tallowa Dam, Fitzroy Falls Dam and Wingecarribee Dam. Wingecarribee River is a tributary of Warragamba River, so water pumped into Wingecarribee Reservoir can be released into Warragamba Dam and hence the Sydney water supply. Water can also be released into Nepean Dam via a system of rock cuttings and tunnels known as Glenquarry Cut. Water from the Nepean Dam can be transferred to Sydney, or to Wollongong via Avon Dam.
Power generation
In addition to its water supply capabilities which supplements water supplies to the Sydney area, the Shoalhaven Scheme also comprises two hydro-power facilities, with total generating capacity of 240 megawatts (320,000 hp). The flexibility of the scheme is that it can operate as either a pump or a generator. During off peak periods, it utilises excess electricity from the grid to pump water back up to the reservoir(s) as pumped storage. The two power stations are:[1][2] The Kangaroo Valley and Bendeela power stations were completed in 1977 as a joint project between the Electricity Commission of New South Wales and the NSW Metropolitan Water Sewerage and Drainage Board. Management has subsequently been passed from those bodies to Origin Energy and the Sydney Catchment Authority.[1]
Kangaroo Valley Power Station
Kangaroo Valley Power Station in the Kangaroo Valley has two 80-megawatt (110,000 hp) pump turbines, for a total electricity generating capacity of 160 megawatts (210,000 hp). From Bendeela Pondage, the Kangaroo Valley Pumping and Power Station lifts water a further 480 metres (1,570 ft) to Fitzroy Falls Reservoir via a tunnel, shaft, pipeline, and canal. Water available for hydro-electric power generation is discharged back down the conduits, driving turbines as it returns to Bendeela Pondage and then Lake Yarrunga.
Bendeela Pondage
Bendeela Pondage, completed in 1972, is an earth and rockfill embankment dam structure located above the Bendeela Hydroelectric Pumped Storage Power Station on the Shoalhaven River / Kangaroo River which both go into the Tallowa Dam and the Kangaroo Valley Hydroelectric Pumped Storage Power Station.
It's a small storage buffer dam for between the two Pumped-storage Hydroelectric Power Station's.
Bendeela Power Station
Bendeela Power Station has two 40-megawatt (54,000 hp) pump turbines, for a total of 80 megawatts (110,000 hp) of electricity generating capacity. Bendeela Pumping and Power Station, located on the Kangaroo River arm of Lake Yarrunga, lifts water 127 metres (417 ft) to Bendeela Pondage.
Environmental consequences
The Shoalhaven River and its main tributary the Kangaroo River. Tallowa Dam has been a barrier to migratory native fish with estuarine/marine juvenile stages, blocking species including Australian bass from more than 80% of their former range in the Shoalhaven system. Stockings of hatchery bred bass in Lake Yarrunga has been an attempt to remediate the situation.[citation needed] A fishway for Tallowa Dam has been discussed for more than 20 years but was not constructed until 2009.[3] Lake Yarrunga also contains exotic species such as carp, which are now present in high densities. A fish lift began operation in August 2009.[4]
See also
New South Wales portal
Water portal
Renewable energy portal
- List of reservoirs and dams in Australia
References
Energy in New South Wales |
---|
Generation | Biomass combustion |
- Broadwater Sugar Mill
- Broadwater Biomass Co-Gen
- Condong Sugar Mill
- Condong Biomass Co-Gen
- Harwood Sugar Mill
- Redbank
- Visy Paper, Tumut
|
---|
Cogeneration |
- Amcor, Bomaderry
- BlueScope Steel, Port Kembla
- Macquarie University
- Stadium Australia
- University of Western Sydney
- Visy Paper, Smithfield
|
---|
Hydro-electric | |
---|
Solar generation |
- Beryl
- Bomen
- Broken Hill
- Coleambally
- Darlington Point
- Finley
- Griffith
- Jemalong CSP
- Jemalong
- Limondale
- Nevertire
- Nyngan
- Parkes
- Sunraysia
|
---|
Wind farms | |
---|
Coal fired |
- Bayswater
- Eraring
- Liddell
- Mount Piper
- Vales Point
|
---|
Natural gas |
- Appin Mine
- Belrose
- Colongra
- Earthpower Camelia
- Jacks Gully
- Liddell
- Lucas Heights I
- Lucas Heights II
- Shoalhaven Landfill Gas Project
- Smithfield Energy Facility
- Sydney Water, Malabar
- Tahmoor
- Tallawarra
- Teralba
- Tower Mine
- Uranquinty
- Wilga
|
---|
Generator Companies |
- Delta Electricity
- Eraring Energy (subsidiary of Origin)
- Macquarie Generation (subsidiary of AGL Energy)
- Snowy Hydro
|
---|
|
---|
Distribution | Distribution network operators |
- Ausgrid
- Endeavour Energy
- Essential Energy
|
---|
Transmission network operators | |
---|
Retail companies and brands |
- ActewAGL
- AGL Energy
- Click Energy
- Country Energy
- EnergyAustralia
- Integral Energy
- Origin Energy
- Powershop
- ReAmped Energy
- Red Energy
|
---|
|
---|
Historical |
- Advance Energy
- Australian Inland
- Bega Valley County Council
- Brisbane Water County Council
- Electricity Commission of New South Wales
- EnergyAustralia (state government enterprise)
- Great Southern Energy
- Illawarra Electricity
- Mackellar County Council
- Macquarie County Council (Western Power)
- New England County Council (New England Electricity)
- North West County Council (North West Electricity)
- Northern Riverina County Council (Northern Riverina Electricity)
- Northern Rivers County Council (Northern Rivers Electricity)
- NorthPower
- Ophir County Council (Ophir Electricity)
- Orion Energy
- Oxley County Council (Oxley Electricity)
- Pacific Power
- Peel-Cunningham County Council (PCCC Electricity)
- Prospect Electricity
- Shortland County Council (Shortland Electricity)
- Southern Mitchell County Council (Southern Mitchell Electricity)
- Southern Riverina County Council (Southern Riverina Electricity)
- Southern Tablelands County Council (Southern Tablelands Electricity)
- St George County Council
- Sydney County Council (Sydney Electricity)
- Ulan County Council (Ulan Electricity)
- White Cliffs Solar Power Station
|
|
|
Water supply in New South Wales, Australia |
---|
Dams and reservoirs in Greater Metropolitan Sydney | |
---|
Sewerage and other water infrastructure in Greater Metropolitan Sydney | Aqueducts |
- Cooks River
- Johnston's Creek
- Lewisham
- Mosman Bay
- Old Como
- Whites Creek
- Wolli Creek
|
---|
Pumping stations |
- Annandale (#3)
- Camilia (#67)
- Mascot (#38)
- Rozelle (#27)
- Rushcutters Bay
- Ryde
- Sydenham Pit and Drainage (#1)
- Ultimo (#1)
|
---|
Vent stacks |
- Bondi
- Burwood
- Croydon
- Lewisham
- Marrickville
- North Sydney
- Stanmore
|
---|
Other infrastructure |
- Bondi Ocean Outfall Sewer
- Double Bay Compressed Air Ejector Station
- Middle Harbour Syphon
- Western Outfall Main Sewer
|
---|
|
---|
Regional dams and reservoirs | |
---|
Other water sources |
- Sydney Desalination Plant
|
---|
Companies and government agencies |
- Australian Water Technologies
- Central Coast Water Corporation
- Essential Energy
- Goldenfields Water
- Hunter Water
- MidCoast Water
- Riverina Water County Council
- Rous Water
- Sydney Water
- WaterNSW
|
---|
Regulators |
- Energy & Water Ombudsman
- NSW Department of Primary Industries
- NSW Office of Water
|
---|
Historical |
- Board of Water Supply and Sewerage
- Metropolitan Board of Water Supply and Sewerage
- Metropolitan Water Sewerage and Drainage Board
- Water Board
- State Water Corporation
- Sydney Catchment Authority
|
---|
На других языках
[de] Shoalhaven-System
Das Shoalhaven-System ist ein System von drei Stauseen und zwei Wasserkraftwerken im Osten des australischen Bundesstaates New South Wales. Es dient sowohl der Sammlung von Trinkwasser für den Großraum Sydney als auch der Gewinnung elektrischer Energie aus Wasserkraft. Es entstand als gemeinsames Projekt der Electricity Commission of New South Wales und dem New South Wales Metropolitan Water, Sewerage an Drainage Board. Der Betrieb der Anlagen wurde nach Fertigstellung in die Verantwortung von Eraring Energy und der Sydney Catchment Authority übergeben.
- [en] Shoalhaven Scheme
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии