Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each[1] having a total capacity of 220 MW.
This article may be expanded with text translated from the corresponding article in Croatian. (April 2017) Click [show] for important translation instructions.
|
| Country | Croatia |
|---|---|
| Location | Senj |
| Reservoir | |
| Creates | Senj |
| Senj Hydroelectric Power Plant | |
It is operated by Hrvatska elektroprivreda.[2][3]
Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. [4]
Hydroelectric power stations in Croatia | ||
|---|---|---|
| ||
| Authority control |
|
|---|
This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it. |
This article about a Croatian building or structure is a stub. You can help Wikipedia by expanding it. |