The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven,[1] on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level.

Royd Moor Wind Farm
CountryEngland
Location6 km west of Penistone, Barnsley South Yorkshire
Coordinates53°32′15″N 1°41′18″W
Commission date1993
Owner(s)E.ON
Power generation
Units operational13 AN Bonus 450/37 turbines
Nameplate capacity6 MW
External links
CommonsRelated media on Commons

These turbines were completed in 1993 and are 35 metres (115 ft) in height to the hub and have a rotor diameter of 37 metres (121 ft). The maximum output is 6 mW, equivalent to the annual energy required to power 3,300 homes.[2]

The original planning application was for a 25-year operation but this has been extended to 30 years. Currently, the farm is due to be decommissioned in 2023.


References


  1. "E.ON UK - Royd Moor". www.eon-uk.com. Archived from the original on 3 January 2010. Retrieved 11 March 2009.
  2. "The OPET Network - Technical Sheet of THERMIE Project Renewables - Wind Energy (RWE-10)". cordis.europa.eu. Archived from the original on 14 March 2012. Retrieved 11 March 2009.






Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии