The Kwinana Waste to Energy Plant is a waste-to-energy power station under construction in Kwinana Beach, Western Australia. Once completed, the facility is scheduled to process in excess of 400,000 tonnes (880 million pounds) of waste and will produce 36 MW of power.
Kwinana Waste to Energy Plant | |
---|---|
![]() The Kwinana Waste to Energy Plant under construction, December 2020 | |
![]() | |
Country | Australia |
Location | Kwinana Beach, Western Australia |
Coordinates | 32°12′39″S 115°46′40″E |
Status | Under construction |
Construction began | October 2018 |
Commission date | Late 2021 (planned) |
Construction cost | A$668 million |
Owner(s) | Avertas Energy |
Operator(s) | Veolia |
Employees | 60 |
Thermal power station | |
Primary fuel | Waste |
Power generation | |
Nameplate capacity | 36 MW |
External links | |
Website | avertas.com.au |
Commons | Related media on Commons |
At the time of project approval, Australia generated 23 million tonnes of waste to landfill every year, with the state of Western Australia having the lowest waste recovery and highest waste generation rate per capita in the country. The geography of Perth, situated on a sandy coastal plain and relying heavily on groundwater as a source of potable water, meant new landfill sites were unlikely to be approved in the metropolitan region and existing ones were nearing capacity.[1] As a consequence, the Government of Western Australia encouraged local councils to end their dependency on landfills by the year 2020 as the practice was not sustainable.[2]
As of the time of approval, the Kwinana plant was scheduled to take up 25 percent of Perth's post-recycling waste that would otherwise be destined for landfill,[3] 400,000 tonnes (880 million pounds) of domestic, commercial and industrial waste.[2]
At the start of construction in October 2018, the Kwinana Waste to Energy Plant was the first large waste-to-energy facility to be constructed in Australia. The facility is intended to take waste otherwise destined for landfill from the Cities of Armadale, Canning, Gosnells, Kwinana, Mandurah and South Perth, as well as the Shires of Murray and Serpentine-Jarrahdale.[2] Approval of the Kwinana plant was followed by the approval of the East Rockingham Waste to Energy facility in January 2020, which is intended to take waste from the Cities of Cockburn, Belmont, Kalamunda and Swan as well as the Shire of Mundaring.[4] A third plant in western Australia, in Port Headland, will use a different low temperature gasification technology, something initially envisioned for the East Rockingham facility as well.[2]
Construction of the facility will employ 800 people and cost A$668 million, while operation, carried out by Veolia, will employ 60. The construction of the facility, carried out by Acciona Construction, received A$23 million in federal funding from the Australian Renewable Energy Agency while a further $90 million in funding were provided by the Clean Energy Finance Corporation.[2]
Power generation at Kwinana will be achieved through thermal grate technology, whereby the burning of waste will be used to heat steam.[2] The waste created in the process will be reused in a brick making plant which will be located at the site.[5]
The plant is owned by Avertas Energy, which is jointly owned by Macquarie Capital and Dutch Infrastructure Fund.[6]