Billingham Biomass Power Station is a planned biomass power station, that is to be built on the River Tees at Billingham. It is to be built on the site of the former coal-fired North Tees Power Station.[1] The station will have a generating capacity of 45 megawatts (MW).[2]
This article needs to be updated. (November 2015) |
| Billingham Biomass Power Station | |
|---|---|
![]() | |
| Country | England |
| Location | Billingham |
| Coordinates | 54.587°N 1.261°W / 54.587; -1.261 |
| Status | Planned |
| Owner(s) | Gaia Power |
| Thermal power station | |
| Primary fuel | Biomass |
| Power generation | |
| Nameplate capacity | 45 MW |
The station was granted planning permission in October 2009.[2] The construction of the power station will cost £200 million, and is expected to be completed by 2012. The project was initiated by Gaia Power, who chose Aker Solutions to develop the project.[3]
As at October 2017 the old power station site remains undeveloped.
Electricity generation in North East England | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Generating sites |
| ![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Organisations and personnel |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
This article about a County Durham building or structure is a stub. You can help Wikipedia by expanding it. |