Alpha Ventus Offshore Wind Park (before renaming known as Borkum West Offshore Wind Park) is Germany's first offshore wind farm. It is situated in the North Sea45 kilometres (28mi) north of the island of Borkum.
This article may be expanded with text translated from the corresponding article in German. (November 2018) Click [show] for important translation instructions.
View a machine-translated version of the German article.
Machine translation like DeepL or Google Translate is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Consider adding a topic to this template: there are already 9,481 articles in the main category, and specifying|topic= will aid in categorization.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Wikipedia article at [[:de:Alpha Ventus Offshore Wind Park]]; see its history for attribution.
You should also add the template {{Translated|de|Alpha Ventus Offshore Wind Park}} to the talk page.
For more guidance, see Wikipedia:Translation.
Alpha Ventus
Aerial view of Alpha Ventus wind park (may 2012)
Location of Alpha Ventus off the coast of Germany on the North Sea
Alpha Ventus' location in the wind farms of the German BightAlternative map of Alpha Ventus' location, with wind park layout included.
History
Construction work at alpha ventus wind park (July 2009)
The application for construction of the wind farm near Borkum was submitted in 1999. The permit was given by the Federal Maritime and Hydrographic Agency in 2001. In 2007, contracts for supplying wind turbines were signed with REpower and Multibrid (later: Areva Wind and Adwen). That same year, a contract for the construction of a subsea cable connection to the German grid was signed. Construction of the alpha ventus substation started in July 2008. On July15, 2009, the first wind turbine was installed and the first six turbines delivered by Multibrid went operational in August 2009. Installation of another six turbines delivered by REpower started in September 2009.[1] The foundations for the Multibrid turbines were so called tripods designed by OWT. The foundations for the REpower turbines were developed and designed by OWEC Tower. Construction of the wind farm was completed on November 16, 2009 after a seven-month construction period. On April27, 2010 the farm was officially opened and set into commercial operation.[2]
Description
The wind farm is owned by Deutsche Offshore-Testfeld und Infrastruktur-GmbH & Co. KG, a joint venture of EWE (47.5%), E.ON (26.25%), and Vattenfall (26.25%).[3] It consists of twelve turbines, all with capacity of five megawatts. There are six Adwen AD 5-116 (former Areva Multibrid (M5000)) turbines and six REpower 5M turbines. Turbines stand in 30m of water and are not visible from land, however they are barely visible from Norderney's lighthouse, and easily from the island of Borkum.[4] The REpower turbines are installed onto jacket foundations (OWEC Jacket Quattropods) by the crane ship Thialf and Adwen turbines are installed onto tripod-style foundations by the jack-up barge Odin.[1] In May 2010, two Multibrid generators went off service due severe overheating in their gearboxes.[5]
Due to delays, the cost of the project grew from 190million to 250million euro (US$270 to $357million), or 4200€/kW (6000$/kW).[6][7]
In 2011, the wind farm had the highest registered capacity factor of 50.8% of most European offshore wind farms.[8][9] This was exceeded in 2012 with a capacity factor of 55%,[failed verification] a global record. The project team noted that the expected capacity factor of 42% was a considerable underestimation.[10][11] However, in 2013 the capacity factor was 42.7%.[12] This is likely due to other wind parks nearby being built, since wind turbines slow down the wind slightly.
Alpha Ventus Offshore Wind Park as seen from the Norderney lighthouse
Research
Because it is the first offshore wind farm in Germany, alpha ventus is accompanied by several research projects sponsored by the Federal Ministry for Environment (BMU). In 2003, the research platform FINO1 was built approximately 400m to the west of the wind farm. Research interests include:[13]
investigation of the flow conditions in the wind farm
measurement of wind and wave load
further development and adaptation of wind turbine components to offshore conditions
accompanying ecological research
development of new wind farm control systems
logistic problems and the grid integration of offshore wind farms
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025 WikiSort.org - проект по пересортировке и дополнению контента Википедии