Power plant / Power plant
#1 Grand Coulee Dam
Grand Coulee Dam is a concrete gravity dam on the Columbia River in the U.S. state of Washington , built to produce hydroelectric power and provide irrigation water. Constructed between 1933 and 1942, Grand Coulee originally had only two powerhouses. The third powerhouse ("Nat"), completed in 1974 t
- ... tion Status Operational Construction began July 16, 1933 (89 years ago) ( 1933-07-16 ) Opening date june 1, 1942 (80 years ago) ( 1942-06-01 ) Construction cost Original dam: $163 million 1943 [1] Third powe ...
- ... h dam in 1935, and it was completed in 1942. The first waters overtopped Grand Coulee's spillway on june 1 of that year. Power from the dam fueled the growing industries of the Northwest United States during ...
- ... tion in January 1941 . The reservoir was full and the first water flowed over the dam's spillway on june 1 , 1942, while work was officially complete on January 31 , 1943. [45] [46] The last of the original ...
#2 Calvert Cliffs Nuclear Power Plant
The Calvert Cliffs Nuclear Power Plant ( CCNPP ) is a nuclear power plant located on the western shore of the Chesapeake Bay near Lusby , Calvert County , Maryland in the Mid-Atlantic United States . It is the only nuclear power plant in the state of Maryland. Nuclear power plant in Calvert County,
- ... nty , near Lusby , Maryland Coordinates 38°25′55″N 76°26′32″W Status Operational Construction began june 1, 1968 ( 1968-06-01 ) Commission date Unit 1: May 8, 1975 Unit 2: April 1, 1977 Construction cost $2. ...
#3 Peach Bottom Nuclear Generating Station
Peach Bottom Atomic Power Station , a nuclear power plant , is located 50 miles (80 km) southeast of Harrisburg in Peach Bottom Township , York County, Pennsylvania , on the Susquehanna River three miles north of the Maryland border. Nuclear power plant in Pennsylvania Peach Bottom Atomic Power St
- ... nal Construction began Unit 1: February 1, 1962 Units 2–3: January 31, 1968 Commission date Unit 1: june 1, 1967 Unit 2: July 5, 1974 Unit 3: December 23, 1974 Decommission date Unit 1: November 1, 1974 Cons ...
#4 Palo Verde Nuclear Generating Station
The Palo Verde Generating Station is a nuclear power plant located near Tonopah, Arizona , [5] in western Arizona . It is located about 45 miles (72 km) due west of downtown Phoenix, Arizona , and it is located near the Gila River , which is dry save for the rainy season in late summer. Nuclear po
- ... 3′21″N 112°51′54″W Status Operational Construction began Unit 1: 25 May 1976 ( 1976-05-25 ) Unit 2: 1 june 1976 ( 1976-06-01 ) Unit 3: 1 June 1976 ( 1976-06-01 ) Commission date Unit 1: 28 January 1986 (36 ...
- ... al Construction began Unit 1: 25 May 1976 ( 1976-05-25 ) Unit 2: 1 June 1976 ( 1976-06-01 ) Unit 3: 1 june 1976 ( 1976-06-01 ) Commission date Unit 1: 28 January 1986 (36 years ago) ( 1986-01-28 ) Unit 2: 1 ...
#5 Hinkley Point C nuclear power station
Hinkley Point C nuclear power station ( HPC ) is a two-unit, 3,200 MWe EPR nuclear power station under construction in Somerset , England. [4] Nuclear power station under construction in England Hinkley Point C nuclear power station (HPC) A 3D model of the Hinkley Point C nuclear power station Cou
- ... on was likely to rise by up to £2.9 billion and the total bill could be more than £22 billion [167] 1 june 2020, EDF announces that the reactor base for unit 2 has been completed at a much faster rate than ...
#6 R. E. Ginna Nuclear Power Plant
The Robert Emmett Ginna Nuclear Power Plant , commonly known as Ginna ( / ɡ ɪ ˈ n eɪ / ghih- NAY ), is a nuclear power plant located on the southern shore of Lake Ontario , in the town of Ontario , Wayne County, New York , United States, approximately 20 miles (32 km) east of Rochester, New York .
- ... rdinates 43°16′40″N 77°18′36″W Status Operational Construction began April 25, 1966 Commission date june 1, 1970 Construction cost $346.15 million (2007 USD) [1] Owner(s) Constellation Energy Operator(s) Con ...
#7 Sequoyah Nuclear Plant
The Sequoyah Nuclear Plant is a nuclear power plant located on 525 acres (212 ha) located 7 miles (11 km) east of Soddy-Daisy, Tennessee , and 20 miles (32 km) north of Chattanooga, abutting Chickamauga Lake , on the Tennessee River . The facility is owned and operated by the Tennessee Valley
- ... ational Construction began May 27, 1970 ( 1970-05-27 ) Commission date Unit 1: July 1, 1981 Unit 2: june 1, 1982 Construction cost $3.455 billion (2007 USD) [1] Owner(s) Tennessee Valley Authority Operator(s ...
- ... ion began on July 1, 1981. [4] [5] Unit 2 was licensed on September 15, 1981 and began operation on june 1, 1982. [6] [5] Sequoyah was the first new nuclear plant licensed after the Three Mile Island acciden ...
#8 Cooper Nuclear Station
Cooper Nuclear Station (CNS) is a boiling water reactor (BWR) type nuclear power plant located on a 1,251-acre (506 ha) site near Brownville , Nebraska between Missouri River mile markers 532.9 and 532.5, on Nebraska's border with Missouri . It is the largest single-unit electrical generator in Ne
- ... near Brownville , Nebraska Coordinates 40°21′43″N 95°38′29″W Status Operational Construction began june 1, 1968 Commission date July 1, 1974 Construction cost $1.152 billion (2007 USD) [1] Owner(s) Nebraska ...
#9 Aire valley power stations
Aire valley power station may refer to one or all of three power stations on the River Aire in Yorkshire, England: [1] Ferrybridge C power station (1966–2016) Eggborough power station (1967–2018) Drax power station (1974–present) Power stations in the Aire Valley, Yorkshire, England By the 1990s, th
- ... vening of 17 March 2022, the three remaining cooling towers at Ferrybridge were demolished. [17] On 1 june 2022, a section of the boiler house at Eggborough known as 'DA Bay' was demolished. [18] [19] On 24 ...
#10 Hudson Generating Station
Hudson Generating Station was a power plant operated by PSEG Fossil LLC, a subsidiary of Public Service Enterprise Group (PSEG). It was located in Jersey City in Hudson County , New Jersey , United States. The site was in operation from 1906 to 2017, but as of 2011 only one unit was in operation at
- ... ck-end technology emission controls. The generating station was closed permanently by PSEG Power on june 1, 2017. [4] [5] [6] The 241-acre site was sold to Chicago-based Hilco Redevelopment Partners in Janua ...
#11 Eggborough power station
Eggborough power station was a coal-fired power station in North Yorkshire , England , which was capable of co-firing biomass . It was situated on the River Aire , between the towns of Knottingley and Snaith , deriving its name from the nearby village of Eggborough . The station had a generating cap
- ... ng the first to come down in 2021. [5] The Bunker Bay was demolished on 6 March 2022, the DA Bay on 1 june 2022 and the chimney and boiler house on 24 July 2022. There were initially plans to replace it wit ...
- ... he Turbine Hall was dismantled prior to the DA Bay's demolition that was scheduled in June 2022. On 1 june 2022, a section of the boiler house known as 'DA Bay' was demolished. [48] [49] On 24 July 2022, at ...
#12 Belo Monte Dam
The Belo Monte Dam ( formerly known as Kararaô ) is a hydroelectric dam complex on the northern part of the Xingu River in the state of Pará , Brazil . After its completion, with the installation of its 18th turbine, in November 2019, the installed capacity of the dam complex is 11,233 megawatts (
- ... lation license was granted on 26 January 2011 and a full license to construct the dam was issued on 1 june 2011. The licensing process and the dam's construction have been mired in federal court battles; th ...
- ... design, production, installation and commissioning of generation and associated equipment. [28] On 1 june 2011, IBAMA granted the full license to construct the dam after studies were carried out and the co ...
#13 Yacyretá Dam
The Yacyretá Dam or Jasyretâ-Apipé Hydroelectric Power Station (from Guaraní jasy retã , "land of the moon ") is a dam and hydroelectric power plant built over the waterfalls of Jasyretâ-Apipé in the Paraná River , between the Paraguayan City of Ayolas and the Argentine Province of Corrientes . The
- ... e main branch of the river was closed and on May 19, the other branch, Aña Kuá, was also closed. On june 1, 1993, the navigational ship lock was opened, and on September 2, 1994, the first hydroelectric Kapl ...
#14 Pilgrim Nuclear Power Station
Pilgrim Nuclear Power Station ( PNPS ) was a nuclear power plant in Massachusetts . The facility is located in the Manomet section of Plymouth on Cape Cod Bay , south of the tip of Rocky Point and north of Priscilla Beach . Like many similar plants, it was constructed by Bechtel , and was powered by
- ... on Commons [ edit on Wikidata ] On October 13, 2015, plant owners announced that it would close by june 1, 2019, citing "market conditions and increased costs," which would have included tens of millions of ...
#15 Vogtle Electric Generating Plant
The Alvin W. Vogtle Electric Generating Plant , also known as Plant Vogtle ( / ˈ v oʊ ɡ əl / ), [4] is a two-unit nuclear power plant located in Burke County , near Waynesboro , Georgia , in the southeastern United States . It is named after a former Alabama Power and Southern Company board chairman
- ... n Unit 1–2: August 1, 1976 Unit 3: March 12, 2013 Unit 4: November 19, 2013 Commission date Unit 1: june 1, 1987 Unit 2: May 20, 1989 Unit 3: Second Quarter 2023 (planned) Unit 4: Fourth Quarter 2023 (planne ...
- ... utdown Net (Summer) Gross Vogtle-1 [14] Westinghouse 4-loop 1150 1229 August 1, 1976 March 27, 1987 june 1, 1987 Vogtle-2 [15] 1152 April 10, 1989 May 20, 1989 Vogtle-3 [16] AP1000 1117 1250 March 12, 2013 E ...
- ... e for the nuclear island. [36] This operation was completed on March 14. [37] During the weekend of june 1, 2013, assembly of the containment vessel began with the bottom head of the vessel being lifted into ...
#16 Baglihar Dam
Baglihar Dam (Hindi: Baglihār Bāndh ), also known as Baglihar Hydroelectric Power Project, is a run-of-the-river power project on the Chenab River in the Ramban district of Jammu and Kashmir , India. [3] The first power project executed by the Jammu and Kashmir Power Development Corporation, it was
- ... awdown flushing, the reservoir would have been completely silted in 13 years period by 2017. [8] On 1 june 2010, India and Pakistan had a meeting of the Permanent Indus Commission , where they resolved the ...
#17 Quad Cities Nuclear Generating Station
Quad Cities Generating Station is a two-unit nuclear power plant located near Cordova, Illinois , United States, on the Mississippi River . The two General Electric boiling water reactors give the plant a total gross electric capacity of approximately 1,880 MW . It was named for the nearby cities
- ... On June 2, 2016, Exelon announced its intentions to close Quad Cities Nuclear Generating Station on june 1, 2018 due to the plant's profitability and a lack of support from the Illinois state legislature. [2 ...
- ... M Interconnection (the power-grid administrator covering northern Illinois), for the year beginning june 1, 2018, was $215 per megawatt-day, which, divided for 24 hours, translates to $8.96/MW·h. Adding thos ...