The Xudabao Nuclear Power Plant, known also as Xudapu, is a nuclear power station under construction in Xudabao Village, Haibin County, Xingcheng, Huludao, on the coast of Liaoning Province, in northeast China. It was initially planned to have six 1000-MW AP1000 light water reactors,[1] but currently only the first two are still planned and the further 2 units will be VVER-1200s.[2]
Xudabao Nuclear Power Plant | |
---|---|
![]() | |
Country | People's Republic of China |
Location | Xingcheng, Huludao, Liaoning |
Coordinates | 40°21′5″N 120°32′45″E |
Construction began | 28 July 2021 |
Construction cost | CNY 110 billion (US$17.1 billion) |
Owner(s) | CNNC, Datang International Power Generation Company, State Development & Investment Corporation |
Operator(s) | Liaoning Nuclear Power Company Ltd. |
Nuclear power station | |
Reactor type | AP1000 PWR VVER-1200 PWR |
Power generation | |
Units planned | 2 × 1000 MW |
Units under const. | 2 × 1150 MW |
China National Nuclear Corporation (CNNC) owns 70% of the project, along with Datang International Power Generation Co. (20%), and State Development and Investment Corporation (10%). China Nuclear Power Engineering Company (CNPEC) is the general contractor for the project; in 2016 the initial version with 6 AP1000 was expected to cost some CNY 110 billion ($17.1 billion).[3]
Preliminary work on the site began in 2010, but no nuclear concrete pour was made, and works were suspended for several years after the 2011 Fukushima Daiichi nuclear disaster. In 2014, the National Nuclear Safety Administration (NNSA) granted approval for the first two units. In 2016, China Nuclear Industry 22 Construction Company (CNI22), a subsidiary of China Nuclear Engineering and Construction Corporation (CNECC) signed an EPC contract for the first two units.[4]
China National Nuclear Corporation (CNNC) and Atomstroyexport signed the detailed contract for the construction of two VVER-1200s (Xudabao 3 and 4) on 7 March 2019. Commercial operation of both units is expected in 2028.[5]
First concrete pour started on 28 July 2021, with unit 3, which despite its designation is the first reactor at the site. Work on unit 4 began in May 2022.[6] Rosatom will supply the nuclear island; the turbine generators will be supplied by China .[7]
The Xudabao Nuclear Power Plant consist of 4 planned reactors.
Unit | Type | Net Capacity | Gross Capacity | Construction start | Operation start | Notes |
---|---|---|---|---|---|---|
Xudabao 1 (planned) | AP1000 | 1000 MW | [1] | |||
Xudabao 2 (planned) | AP1000 | 1000 MW | [1] | |||
Xudabao 3 | VVER1200 | 1150 MW | 1200 MW | 29.07.2021[7] | 2028 (planned) | [2] |
Xudabao 4 | VVER1200 | 1150 MW | 1200 MW | 19-05-2022[8] | 2028 (planned) | [2] |
Nuclear power in China | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Operating power plants | |||||||||||
Power plants under construction | |||||||||||
Planned power plants | |||||||||||
Proposed power plants | |||||||||||
Research, experimental and prototype reactors |
| ||||||||||
Commercial reactor designs |
| ||||||||||
Organizations |
| ||||||||||
Related categories |
| ||||||||||
|