Upper Trishuli 3A Hydropower Station (Nepali: माथिल्लो त्रिशुली ३a जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Rasuwa District of Nepal. The flow from Trisuli River is used to generate 60 MW electricity.
Upper Trishuli 3A Hydropower Station | |
---|---|
![]() ![]() Location of Upper Trishuli 3A Hydropower Station in Nepal | |
Official name | Upper Trishuli 3A Hydropower Project |
Country | Nepal |
Location | Rasuwa District |
Coordinates | 28°1′21″N 85°12′38″E |
Purpose | Power |
Status | Operational |
Owner(s) | Mai Valley Hydropower P Ltd. |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Trisuli River |
Commission date | 2076-05-13 BS |
Type | Run-of-the-river |
Installed capacity | 60 MW |
The plant is owned and developed by Nepal Electricity Authority (NEA). The plant started generating electricity from 2076-05-13 BS. The generation licence will expire in 2102-11-14 BS.[1] The power station is connected to the national grid.[2]
The total project cost was US$125.775 million. The project was funded Government of Nepal through NEA and the loan provided by China Exim Bank.[3]