Trishuli Hydropower Station is a peaking run-of-river hydropower station located at Trishuli bazaar of Nuwakot district in Nepal. The intake of the plant lies in Rasuwa district. The plant was constructed in 1976 with an installed capacity of 21 MW (7 units, 3 MW each). The plant was overhauled in 1995 and upgraded to 24 MW (6 units, 3.5 MW each plus one unit of 3 MW). The project was developed jointly by the Government of India and the Government of Nepal. The project cost was INR 140 million. The annual energy generation is 163 GWh.Nepal Electricity Authority, a government-run organization, owns and operates this plant. Another power station Devighat Hydropower Station is a cascade project to this power station.[1]

Trishuli Hydropower Station
CountryNepal
LocationRasuwa, Nuwakot
PurposePower
StatusOperational
Opening date1967
Owner(s)Nepal Electricity Authority
Dam and spillways
Type of damGravity
ImpoundsTrishuli River
Height5 m (16 ft)
Length139.6 m (458 ft)
Trishuli Hydropower Station
Coordinates27.922745135301923°N 27.920560023272902°E / 27.922745135301923; 27.920560023272902
Commission date1967
TypeRoR
Hydraulic head51.4 m (169 ft)
Turbines6 x 3.5 MW + 1 x 3 MWFrancis-type;
Installed capacity24 MW

The design flow is 45.66 m3/s and the rated head is 51.4 m.[2]


See also


Nepal Electricity Authority


References


Map all coordinates using: OpenStreetMap 
Download coordinates as: KML





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии