energy.wikisort.org - Power_plant

Search / Calendar

Pelton Dam is a major dam on the Deschutes River in Jefferson County, Oregon, owned and operated as a hydroelectric facility by Portland General Electric, one element of its Pelton Round Butte Project on the Deschutes.

Pelton Dam
Pelton Dam

The concrete arch dam at Pelton dates from 1958, has a height of 204 feet (62 m) from bedrock, a width of 965 feet (294 m) at its crest, and generates 110 megawatts of electricity.[1]

Upstream, to the south, Pelton Dam impounds the waters of the Deschutes to create the deep Lake Simtustus in a relatively narrow canyon about 7 miles (11 km) back to the 1964 Round Butte Dam. The lake has a surface area of about 540 acres (220 ha) and holds 33,190 acre-feet (40,940,000 m3) of water. The name "Simtustus" honors a native who scouted for the U.S. Army during the 1867–68 campaign against the Paiutes.[2]

Downstream, 2.5 miles (4 km) north, a regulating dam controls the river flow. The area between is called the Pelton Regulating Reservoir. In 1982 the Confederated Tribes of Warm Springs installed a hydroelectric turbine unit in the regulating dam for additional power.[3] Between 2000 and 2005 the CTWS also asserted itself as a stakeholder in the project's re-licensing negotiations between Portland General Electric and the Federal Energy Regulatory Commission, winning key environmental, cultural, and water rights concessions.[4]


References


  1. "Dams and Development Project". Archived from the original on 2011-08-22. Retrieved 2012-07-24.
  2. http://aol.research.pdx.edu/atlas_pages/AOL_261.pdf [bare URL PDF]
  3. "Deschutes River: Hydro Plants and Fish Facilities | PGE". Archived from the original on 2012-06-09. Retrieved 2011-04-01.
  4. "Dams and Development Project". Archived from the original on 2011-08-22. Retrieved 2012-07-24.


На других языках


[de] Lake Simtustus

Der Lake Simtustus ist ein Stausee im Jefferson County im US-Bundesstaat Oregon, 11 km nordwestlich von Madras. Der Deschutes River wird durch den zwischen 1956 und 1958 erbauten Pelton Dam zum Lake Simtustus aufgestaut. Die 294 m weite Bogenstaumauer aus Beton ist 62 m hoch, an ihrer Basis 8 m und auf der Mauerkrone 2,4 m breit. Drei Generatoren erzeugen durch Wasserkraft Strom für mehr als 45.000 Haushalte.
- [en] Pelton Dam



Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии