Menengai II Geothermal Power Station, is a 35 MW (47,000 hp) geothermal power station under construction in Kenya.
Menengai II Geothermal Power Station | |
---|---|
![]() Location of Menengai II Geothermal Power Station | |
Country |
|
Location | Menengai, Nakuru County, Kenya |
Coordinates | 00°11′46″S 36°03′47″E |
Status | Under construction |
Commission date | 2016 (Expected) |
Owner(s) | Quantum Power East Africa |
Power generation | |
Nameplate capacity | 35 MW (47,000 hp) |
The power station is located in the Menengai Crater, approximately 30 kilometres (19 mi), north of Nakuru, the location of the district headquarters. This is approximately 185 kilometres (115 mi), by road, northwest of Nairobi, the capital and largest city in Kenya. The coordinates of Menengai Crater are:0°11'46.0"S, 36°03'47.0"E (Latitude:-0.196105; Longitude:36.063062).[1]
Geothermal Development Company (GDC), a company wholly owned by the Kenyan government has drilled geothermal wells in the Menengai Crater, whose total capacity can generate up to 130 MW (170,000 hp) of electric energy. GDC will sell the steam to three independent power producers (IPPs) to build three geothermal power stations, each with capacity of 35 MW (47,000 hp).[2] The power stations are:[3][4]
Menengai II Geothermal Power Station, whose construction costs were budgeted at KSh4 billion (approx. US$40 million), is owned by Quantum Power East Africa, an independent power producer (IPP).[5] *US$1.00 = KSh100.80 on 4 April 2016
In February 2021, Afik21 reported that Quantum Power East Africa, the developer of this power station, had been majority acquired by Globeleq, a subsidiary of the CDC Group of the United Kingdom.[6]