energy.wikisort.org - Power_plantThe Kaleta Hydropower Plant (Chinese: 凯乐塔水电站),[4] also known as Kaleta Hydropower Project[5] or Kaléta Hydropower Station,[6] is a water conservancy project in the Republic of Guinea,[7] located in the Konkoure River Basinin Western Guinea,[8] with a total installed capacity of 240 MW.[9] This project was constructed by China International Water & Electric Corporation.[10]
Dam in in the Konkoure River Basinin Western Guinea
Kaleta Hydropower Plant 凯乐塔水电站 |
---|
|
Country | Republic of Guinea |
---|
Location | in the Konkoure River Basinin Western Guinea[1] |
---|
Coordinates | 10.4634°N 13.2819°W / 10.4634; -13.2819 |
---|
Purpose | Power |
---|
Construction began | 18 April 2012[2] |
---|
Construction cost | $527 million (an estimated cost)[3] |
---|
The construction of the project officially started on 18 April 2012,[11] with an estimated cost of $527 million.[12] On May 28, 2015, the first unit of the hydropower station was officially connected to the grid for power generation.[13] On September 28, 2015, local time in Guinea, the plant was completed and inaugurated in a celebration ceremony.[14]
Before the Souapiti Hydropower Station is scheduled to be completed and put into operation in 2021,[15] the Kaleta Hydropower Plant is the largest hydropower station in Guinea.[16]
See also
References
- Dango, Abdou Mahaman (25 November 2019). A Guide to Sustainable Energy in West Africa. Cambridge Scholars Publishing. pp. 113–. ISBN 978-1-5275-4399-7.
- "The story behind a new Guinean currency". People's Daily (in Chinese). 8 June 2015.
- "Document of The World Bank(Report No: 68084-GN)". World Bank. 1 May 2012.
- "利比里亚总统维阿参观凯乐塔水电站和苏阿皮蒂水电站". Ministry of Commerce (in Chinese). 2019-07-14.
- Eberhard, Anton; Gratwick, Katharine; Morella, Elvira (18 April 2016). Independent Power Projects in Sub-Saharan Africa: Lessons from Five Key Countries. World Bank Publications. pp. 280–. ISBN 978-1-4648-0801-2.
- Africa Yearbook Volume 12: Politics, Economy and Society South of the Sahara in 2015. Brill Publishers. 13 October 2016. pp. 101–. ISBN 978-90-04-33323-9.
- "Nursing home cures arthritis in the right knee of a female worker in Jiangxi province". CNKI. 2006-04-06.
- "Chinese capital has not 'large-scale withdrawal' from West Africa". Sina. Nov 4, 2014.
- "IFC Advisory Powers Guinea in World Bank Group Effort". International Finance Corporation. Jun 23, 2015.
- "The Impact of Guinea's Souapiti Dam on Displaced Communities". Human Rights Watch. April 16, 2020.
- "The Kaleta Water Conservancy Project in Guinea was officially put into operation". Xinhua News Agency. 30 September 2015.
- "Project Appraisal Document - World Bank Document(Report No: PAD904)" (PDF). World Bank. May 21, 2014.
- "The first unit of Guinea's Keleta Hydropower Station contracted by a Chinese company was officially connected to the grid for power generation". Xinhua News Agency. May 29, 2015.
- "The largest hydropower station in Guinea was completed". Xinhua News Agency. May 29, 2015.
- "Guinea's Souapiti Hydropower Station: Resuming work and production to help the local fight against the epidemic". Ministry of Commerce. 2020-05-19.
- "A delegation from the African Development Bank visited and inspected the Kaleta Hydropower Station and Suapiti Hydropower Station in Guinea". Ministry of Commerce. 2017-03-30.
Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии