energy.wikisort.org - Power_plant

Search / Calendar

The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity.[1] The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018.[2]


Detail


The HillTopper complex's 74 wind turbines are each rated at 2.5 mW.[3] The project's overall 185-mW capacity was pre-sold to Bloomberg LP, Danone North America, General Motors, and Starbucks.[1] The complex utilizes leasehold rights to 7,500 acres of land.[2]


References


  1. "HillTopper Wind Farm, USA". enelgreenpower.com. Enel. Retrieved October 24, 2022.
  2. Blanchette, David (August 12, 2019). "Wind farm project starting in Mount Pulaski area". State Journal-Register. Springfield, Illinois. Retrieved October 24, 2022.
  3. "HillTopper (USA)". thewindpower.net. The Windpower. Retrieved October 24, 2022.




Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии