energy.wikisort.org - Power_plant

Search / Calendar

Gray County Wind Farm near Montezuma, Kansas was the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission back in 2001. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million.[1] The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland.[2]


See also



References


  1. "Wind farm info". Retrieved 2006-05-16.
  2. "Gray County Wind Farm". Retrieved 2006-05-16.






Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии