The Doyang Hydro Electric Project is a NTPC NEEPCO owned hydro power project situated on the River Doyang (a tributary of the River Brahmaputra) located in the Wokha District of Nagaland. It was commissioned in the year 2000 and the total installed capacity of the project is 75 (3 X 25) MW.[1]
![]() | This article may rely excessively on sources too closely associated with the subject, potentially preventing the article from being verifiable and neutral. (July 2020) |
NTPC Power Stations | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Thermal |
| ![]() | ||||||||
Hydel |
|
![]() | This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it. |