The Bright Stalk Wind Farm is a 57-turbine wind farm near Chenoa in northeastern McLean County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 205 megawatts of electricity.[1] The complex was completed in 2019 by EDP Renewables North America at a cost of more than $300 million, and entered operations in 2020.[2]


Detail


The Bright Stalk project's 57 wind turbines are each rated at 3.6 mW.[1] 203 megawatts of the project's overall 205-mW capacity were pre-sold to Walmart (123 mW) and Salesforce (80 mW). The project owner states that the wind farm has created nine permanent jobs in and around Chenoa.[2]


References


  1. "Bright Stalk". edpr.com. EDP Renewables. Retrieved September 23, 2022.
  2. "205-MW Bright Stalk Wind Farm in Illinois now up and running". windpowerengineering.com. Wind Power Engineering. February 6, 2020. Retrieved September 23, 2022.





Текст в блоке "Читать" взят с сайта "Википедия" и доступен по лицензии Creative Commons Attribution-ShareAlike; в отдельных случаях могут действовать дополнительные условия.

Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.

2019-2025
WikiSort.org - проект по пересортировке и дополнению контента Википедии