The Brandåa Hydroelectric Power Station (Norwegian: Brandåa kraftverk) is a hydroelectric power station in the municipality of Rindal in Møre og Romsdal county, Norway. It is a run-of-river hydro power station utilizing a drop of 373 meters (1,224 ft) in some tributaries of the Surna River.[1] Permission was granted for construction in 2006[2] and the plant came into operation in 2009.[1][3] It is operated by Svorka Produksjon AS.[1] It operates at an installed capacity of 4.1 MW,[1] with an average annual production of about 15.8 GWh.[1][3]
| Brandåa Power Station | |
|---|---|
| Official name | Brandåa kraftverk |
| Country | Norway |
| Location | Rindal, Møre og Romsdal |
| Coordinates | 63°05′32″N 9°13′23″E |
| Status | Operational |
| Construction began | 2006 |
| Opening date | 2009; 13 years ago (2009) |
| Owner(s) | Svorka Produksjon[1] |
| Power Station | |
| Hydraulic head | 373 m |
| Installed capacity | 4.1 MW |
| Capacity factor | 44.0% |
| Annual generation | 15.8 GW·h |
This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it. |