Alto Tâmega Dam (Portuguese: Barragem do Alto Tâmega) is a concrete double curvature arch dam on the Tâmega River. It is located in the municipalities of Ribeira de Pena and Vila Pouca de Aguiar, in Vila Real District, Portugal.
| Alto Tâmega Dam | |
|---|---|
Location of Alto Tâmega Dam in Portugal | |
| Official name | Barragem do Alto Tâmega |
| Country | Portugal |
| Location | municipalities Ribeira de Pena and Vila Pouca de Aguiar, Vila Real District |
| Coordinates | 41°34′28.7″N 7°43′52″W |
| Purpose | Power |
| Status | Under construction |
| Opening date | 2024 |
| Dam and spillways | |
| Type of dam | Concrete double curvature arch dam |
| Impounds | Tâmega River |
| Height | 106 m (348 ft) |
| Length | 334 m (1,096 ft) |
| Installed capacity | 160 MW (210,000 hp) |
| Annual generation | 139 GWh |
It is part of the wider Tâmega Electricity-Generating Group formed of 3 dams and 3 plants[1]
Iberdrola signed a 70-year concession with the Government of Portugal in July 2014 for the design, construction and operation of three projects: Alto Tâmega, Daivões and Gouvães dams.[2]
Construction of the dam will be completed in 2024.[3]
Alto Tâmega Dam is a 106.5 m tall and 334 long double-curvature concrete.[4]
The reservoir surface area for the dam has 7.4 km2.[4]
The generating unit of the dam consists of two 80MW turbine units with a maximum flow rate of 200m³/s producing 139GWh of electricity a year. The dam contains two lateral spillways with combined discharge capacity of 1,825m³/s, which protect the dam from over-topping.[4]