langs: 5 июля [ru] / july 5 [en] / 5. juli [de] / 5 juillet [fr] / 5 luglio [it] / 5 de julio [es]
days: july 2 / july 3 / july 4 / july 5 / july 6 / july 7 / july 8
#1 Upper Tamakoshi Hydroelectric Project
The Upper Tamakoshi Hydroelectric Project is a 456 MW peaking run-of-the-river hydroelectric project in Nepal . [1] It is the largest hydroelectric project in Nepal, operating since July 2021. [2] [3] It is sited on the Tamakoshi River (also spelled Tama Koshi), a tributary of the Sapt Koshi river (
#2 Peach Bottom Nuclear Generating Station
Peach Bottom Atomic Power Station , a nuclear power plant , is located 50 miles (80 km) southeast of Harrisburg in Peach Bottom Township , York County, Pennsylvania , on the Susquehanna River three miles north of the Maryland border. Nuclear power plant in Pennsylvania Peach Bottom Atomic Power St
The O'Shaughnessy Dam is located on the Scioto River near Dublin , Ohio , United States . The dam forms O'Shaughnessy Reservoir, which is a major source of drinking water for the city of Columbus . It was completed in 1925 following recommendations of then superintendent Jerry O'Shaughnessy (for who
#4 Wind power in South Australia
Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state. [1] This accounted for 35% of Australia's installed wind power ca