langs: 30 апреля [ru] / april 30 [en] / 30. april [de] / 30 avril [fr] / 30 aprile [it] / 30 de abril [es]
days: april 27 / april 28 / april 29 / april 30 / may 1 / may 2 / may 3
Power plant / Power plant
#1 Carrington Hotel, Katoomba
The Carrington Hotel is a heritage-listed former spa, hotel and power station and now hotel and public bar located at Katoomba Street, Katoomba in the City of Blue Mountains local government area of New South Wales , Australia. It was designed by John Kirkpatrick and Bosser in 1882; and by Edward H.
- ... onveniently situated, including one of the prettiest bridal suites to be found in the colonies." On 30 april 1888 the property was transferred to F. C. Goyder and mortgaged to Hunt and Thorpe. In 1890 Goyder ...
#2 Bakhtiari Dam
The Bakhtiari Dam is an arch dam currently under construction on the Bakhtiari River within the Zagros Mountains on the border of Lorestan and Khuzestan Provinces , Iran . At a planned height of 325 metres (1,066 ft) , [2] it will be the world's tallest dam once completed and withhold the second l
- ... s, Dezab Consulting Engineers, Econo-Electrowatt/Boyri and Stucky Pars Consulting Engineers. [2] On april 30, 2007 the construction contract was awarded to China's Sinohydro Corporation . [3] The contract is w ...
#3 La Crosse Boiling Water Reactor
La Crosse Boiling Water Reactor (LACBWR) is a retired Boiling Water Reactor (BWR) nuclear power plant located near La Crosse, Wisconsin in the small village of Genoa , in Vernon County, Wisconsin , approximately 17 miles south of La Crosse along the Mississippi River . It was located directly adjace
- ... ssioned Construction began March 1, 1963 [1] Commission date November 7, 1969 [1] Decommission date april 30, 1987 [1] Operator(s) Dairyland Power Cooperative Nuclear power station Reactor type BWR [1] Power g ...
#4 Coal Clough Wind Farm
Coal Clough Wind Farm is one of the oldest onshore wind farms in England. The wind farm, which was built for Scottish Power , produced electricity from originally 24 Vestas WD34 wind turbines . It had a total nameplate capacity of 9.6 MW of electricity, [1] enough to serve the average needs of 5,5
- ... s 53.749°N 2.152°W / 53.749; -2.152 Status Operational Commission date 9 December 1992 → (Re-com) 30 april 2015 Owner(s) Scottish Power Site elevation 365 metres (1,198 ft) Power generation Units operationa ...
#5 Idukki Dam
The Idukki Dam is a double curvature Arch dam constructed across the Periyar River in a narrow gorge between two granite hills locally known as Kuravan and Kurathi in Idukki district , Kerala , India . At 168.91 metres (554.2 ft) , [1] it is one of the highest arch dams in Asia . It is constructed
- ... ala Coordinates 9°50′34″N 76°58′34″E Purpose Power generation Status Operational Construction began 30 april 1968 Opening date February 1973 Owner(s) Kerala State Electricity Board Dam and spillways Type of d ...
- ... eliminary works of the project were started. CONSTRUCTION The construction of this Dam commenced on 30 april 1969. The project lead by Dr.D.Babu Paul IAS , who appointed as Project Coordinator, Idukki Hydel P ...
#6 Indian Point Energy Center
Indian Point Energy Center ( I.P.E.C. ) is a three-unit nuclear power plant station located in Buchanan , just south of Peekskill , in Westchester County , New York . It sits on the east bank of the Hudson River , about 36 miles (58 km) north of Midtown Manhattan . The facility has permanently cea
- ... les (58 km) north of Midtown Manhattan . The facility has permanently ceased power operations as of april 30, 2021. Before its closure, the station's two operating reactors generated about 2,000 megawatts ( MW ...
- ... 2 Unit 2: August 1, 1974 Unit 3: August 30, 1976 Decommission date Unit 1: October 31, 1974 Unit 2: april 30, 2020 Unit 3: April 30, 2021 Construction cost $2.450 billion (2007 USD, Units 2–3 only) [1] ($3.01 ...
- ... 4 Unit 3: August 30, 1976 Decommission date Unit 1: October 31, 1974 Unit 2: April 30, 2020 Unit 3: april 30, 2021 Construction cost $2.450 billion (2007 USD, Units 2–3 only) [1] ($3.01 billion in 2020 dollars ...
- ... that the plant would shut down by 2021. [4] [5] The plant permanently stopped generating energy on april 30, 2021. [6] [7] About 1,000 employees lost their jobs as a result of the shutdown. [8] As a result of ...
- ... ght water commercial power reactor. This record is 753 days of continuous operation, and was set on april 30, 2021 for the operating cycle beginning on April 9, 2019. Unit 3 operated at or near full output cap ...
- ... eptember 28, 2013, [90] [91] and the license for Unit 3 was due to expire in December 2015. [92] On april 30, 2007, Entergy submitted an application for a 20-year renewal of the licenses for both units. On May ...