langs: 2 апреля [ru] / april 2 [en] / 2. april [de] / 2 avril [fr] / 2 aprile [it] / 2 de abril [es]
days: march 30 / march 31 / april 1 / april 2 / april 3 / april 4 / april 5
Power plant / Power plant
#1 Gara River Hydro-Electric Scheme
Gara River Hydro-Electric Scheme is a heritage-listed former hydroelectric power station located at Castle Doyle , Armidale Regional Council , New South Wales , Australia. It was designed by Richard Threlfall and built from 1893 to 1895 by Crompton Power Company. The property is owned by the State G
- ... Office of Environment and Heritage . It was added to the New South Wales State Heritage Register on 2 april 1999. [1] Former hydroelectric power station Gara River Hydro-Electric Scheme Location of Gara Rive ...
- ... l name Gara River Hydro-Electric Scheme Type state heritage (archaeological-terrestrial) Designated 2 april 1999 Reference no. 986 Type Electricity Generator/Power Station - hydro-electric Category Utilities ...
- ... ] [1] Gara River Hydro-Electric Scheme was listed on the New South Wales State Heritage Register on 2 april 1999 having satisfied the following criteria. [1] The place is important in demonstrating the cours ...
#2 Grand Ethiopian Renaissance Dam
The Grand Ethiopian Renaissance Dam ( GERD or TaIHiGe ; Amharic : ታላቁ የኢትዮጵያ ሕዳሴ ግድብ , romanized : Tālāqu ye-Ītyōppyā Hidāsē Gidib , Oromo : Hidha Haaromsaa Guddicha Itoophiyaa [6] ), formerly known as the Millennium Dam and sometimes referred to as Hidase Dam ( Amharic : ሕዳሴ ግድብ , romanized : H
- ... Region Coordinates 11°12′55″N 35°05′35″E Purpose Power Status Under construction Construction began 2 april 2011 Opening date 21 July 2020 [1] Construction cost $5 billion USD Owner(s) Ethiopian Electric Pow ...
- ... ompetitive bidding to Italian company Salini Impregilo , and the dam's foundation stone was laid on 2 april 2011 by the Prime Minister Meles Zenawi . [19] A rock-crushing plant was constructed, along with a ...
#3 Burrinjuck Dam
Burrinjuck Dam is a heritage-listed major gated concrete-walled gravity hydro-electric dam at Burrinjuck , Yass Valley Shire , New South Wales , Australia. It has three spillways across the Murrumbidgee River located in the South West Slopes region of New South Wales , Australia . The dam's purpose
- ... d Infrastructure (State Government). It was added to the New South Wales State Heritage Register on 2 april 1999. [3] Dam in South West Slopes, New South Wales Burrinjuck Dam Aerial view of Burrinjuck Dam, 2 ...
- ... ectric scheme. [35] [3] Burrinjuck Dam was listed on the New South Wales State Heritage Register on 2 april 1999. [3] It is listed as a National Engineering Landmark by Engineers Australia as part of the Eng ...
#4 Carrington Hotel, Katoomba
The Carrington Hotel is a heritage-listed former spa, hotel and power station and now hotel and public bar located at Katoomba Street, Katoomba in the City of Blue Mountains local government area of New South Wales , Australia. It was designed by John Kirkpatrick and Bosser in 1882; and by Edward H.
- ... l . The property is privately owned. It was added to the New South Wales State Heritage Register on 2 april 1999. [3] Historic site in New South Wales, Australia Carrington Hotel Location Katoomba Street, Ka ...
- ... fficial name Carrington Hotel; Great Western Hotel Type State heritage (complex / group) Designated 2 april 1999 Reference no. 280 Type Hotel Category Commercial Builders F. Drewett (1882) Howie, Brown and M ...
- ... ba landmark. [17] [3] Carrington Hotel was listed on the New South Wales State Heritage Register on 2 april 1999 having satisfied the following criteria. [3] The place is important in demonstrating the cours ...
#5 Ratcliffe-on-Soar Power Station
Ratcliffe-on-Soar Power Station is a coal-fired power station owned and operated by Uniper at Ratcliffe-on-Soar in Nottinghamshire , England . Commissioned in 1968 by the Central Electricity Generating Board , the station has a capacity of 2,000 MW . As of September 2022, it is one of only three c
- ... February 2009, Unit 1 became the first UK 500 MW coal-fired unit to run for 250,000 hours. [12] On 2 april 2009, E.ON UK announced it had installed a 68 panel solar photovoltaic array at the power station " ...
#6 Myitsone Dam
The Myitsone Dam ( Burmese : မြစ်ဆုံ တာတမံ [mjɪʔsʰòʊɰ̃ tàtəmàɰ̃] ; lit. 'Confluence Dam') is a large dam and hydroelectric power development project which was planned to be built in northern Myanmar (also known as Burma). The proposed construction site is at the confluence of the Mali and N’mai rive
- ... ] In October 2011, Myanmar Foreign Minister traveled to Beijing to settle the dispute. AFTERMATH On 2 april 2012, Weekly Eleven news, a private Burmese news journal, broke news of ongoing activities by CPI a ...
#7 Oroville Dam
Oroville Dam is an earthfill embankment dam on the Feather River east of the city of Oroville, California , in the Sierra Nevada foothills east of the Sacramento Valley . At 770 feet (235 m) high, it is the tallest dam in the U.S. [8] and serves mainly for water supply, hydroelectricity generation
- ... uring phase one were being torn out and replaced with steel-reinforced structural concrete. [60] On april 2, 2019, due to heavy rainfall upstream, the DWR began releasing water over the newly reconstructed sp ...
#8 Piqua Nuclear Generating Station
The Piqua Nuclear Power Facility was an organic cooled and moderated nuclear reactor which operated just outside the southern city limits of Piqua, Ohio in the United States . The plant contained a 45.5- megawatt (thermal) organically cooled and moderated nuclear reactor ( terphenyl , a biphenyl lik
- ... aintenance, and for relocation of the instrumented fuel element from position E-12 to position D-5. april 2, 1965 Several malfunctioning control rod drive units repaired. Concern over possible plugged conditi ...
#9 Quad Cities Nuclear Generating Station
Quad Cities Generating Station is a two-unit nuclear power plant located near Cordova, Illinois , United States, on the Mississippi River . The two General Electric boiling water reactors give the plant a total gross electric capacity of approximately 1,880 MW . It was named for the nearby cities
- ... wn due to high vibrations causing leaks in the main turbine control system. Unit 2 was restarted on april 2, but vibration broke a main steam pipe drain line. The line was repaired and the restart resumed, bu ...